Amazon has made installing solar panels on rooftops a key part of its ESG strategy, but a series of events last year show how challenging greening up major facilities can be.
Between April 2020 and June 2021, solar panels on Amazon fulfillment center roofs caught fire or experienced electrical explosions at least six times. As a result, the company took all U.S. solar rooftops offline last year while it investigated the mishaps.
According to a CNBC report, Amazon hired a consultant to audit its rooftop solar systems in the U.S., Asia-Pacific, Europe, Middle East, and Africa. The study discovered several problems at various sites including mismatched module-to-module connectors, improper installation of connectors, poor wire management, and evidence of water intrusion in the inverters, CNBC reported.
Each fire reportedly cost the company an average of $2.7 million, which included third-party audits of rooftop solar systems, checks on how much electricity they were generating, and repairs for broken or faulty parts.
Despite the setbacks, Amazon remains committed to solar power and continues to monitor the situation, making repairs where needed. As of this April, Amazon had onsite solar at 176 facilities. Its solar program began in 2017.
Related Stories
| May 1, 2012
Bruce E. Brooks Associates announces new commissioning subsidiary
Brooks + Wright Commissioning to be led by Will Wright.
| May 1, 2012
Gilbane to build $100 million cranberries manufacturing facility
Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.
| May 1, 2012
Construction is underway on MLK ambulatory care center in L.A.
Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.
| Apr 30, 2012
Virginia Commonwealth unveils design for Arts Institution
Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.
| Apr 30, 2012
Summit Design + Build completes build-out for Office Concepts
The project is seeking LEED ID Silver certification from the U.S. Green Building Council.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 30, 2012
Gilbane to manage retrofit of the Fraunhofer CSE R&B structure
Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 27, 2012
GreenExpo365.com to offer webinars on EPA’s WaterSense Program
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.