flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fire stops critical to preserving three-decker housing

Codes and Standards

Fire stops critical to preserving three-decker housing

Old multi-family structures continue to provide badly needed homes in urban zones.


By Peter Fabris, Contributing Editor | May 3, 2021

Courtesy Pixabay

Built as working-class housing in the late 19th and early 20th Centuries, the wooden three-story homes still dominate some urban neighborhoods. Though they have fallen out of favor, the structures continue to provide affordable housing in areas badly in need of it.

As decision-makers consider how to preserve these buildings, one of the primary areas of concern is fire safety due to balloon framing construction. Homes built with balloon framing, with long, continuous lumber, offer an unobstructed path for fire to spread quickly from ground level to the attic and roof.

Fire stops between floors can be created in a variety of ways. Insulating foam sealant and nominal lumber like a 2x4 nailed at various distances to break up the balloon framing can help prevent fire from spreading.

Gut renovations can add more fire blocking to break up the exterior walls and retrofit flooring with more fire-resistant materials also helps. Renovations, can be costly, though, going well beyond $100,000 for even basic design changes.

Related Stories

| Oct 3, 2013

Arizona utility pushes for change in building codes to boost efficiency on all commercial projects

Many large construction projects in Arizona are going green by paying attention to energy efficiency, but smaller buildings that are often rented out haven't yet jumped on the bandwagon.

| Oct 3, 2013

Bipartisan energy efficiency bill stalled; may not be revived this year

The Senate spent the first two weeks of September trying to pass bipartisan energy efficiency legislation, commonly known as Shaheen-Portman (S. 1392) that would have impacted building codes.

| Oct 3, 2013

LEED credential exams will feature LEED v4 material beginning next spring

The LEED Professional Credential exams for the LEED Green Associate and LEED AP with specialty designations will feature LEED v4 material beginning in late spring 2014.

| Sep 26, 2013

Ballot period on National CAD Standards open until Oct. 13

The Ballot Comment Period to update the nation’s leading computer-aided design (CAD) standard is now open.

| Sep 26, 2013

OSHA encourages comments on respirable crystalline silica rules

The Occupational Safety and Health Administration’s proposed rulemaking for respirable crystalline silica has been published in the Federal Register.

| Sep 26, 2013

EPA’s final rule on updated ASTM standard likely to be withdrawn

The Environmental Protection Agency is expected to withdraw a direct final ruleissued in Augustregarding an ASTM standard for Phase I Environmental Site.

| Sep 26, 2013

A primer on RoofPoint green-rating system for commercial roofs

The RoofPoint green-rating system can be used to construct more energy-efficient and sustainable commercial roofs.

| Sep 26, 2013

ConsensusDocs releases updated federal subcontract to help construction firms perform federal work

The newly revised ConsensusDocs standard subcontract (ConsensusDocs 752 for federal work) will make it easier for general contractors and subcontractors to perform federal work.

| Sep 18, 2013

Proposed Boston casino development approval will depend partly on sustainability

The movement toward green building has been slow to catch on in the casino industry, but that could change with Suffolk Downs, which plans to build a $1 billion casino in Boston.

| Sep 18, 2013

Regulations could ease firefighters’ fear of roof solar panels

The local fire chief says solar panels are partly to blame after a 300,000 sf refrigerated warehouse in Delanco, N.J., burned down.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021