flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Sponsored Content

Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Clear fire-rated glazing helps create a light-filled, safe space for student athletes and spectators in Niles, Illinois


By Technical Glass Products | May 11, 2015
Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Clear fire-rated glazing transfers daylight. Image courtesy of TGP.

Ancient philosophers theorized four elements comprised the universe: earth, air, water and fire. The latter two of these figure prominently in the design of the Niles North High School Aquatics Center in Skokie, Il., a suburb of Chicago.

On behalf of its client, the Niles Township High School District 219, Legat Architects (Chicago) designed an “expansion and renovation of the aquatics center to improve competitive and educational swimming programs, promote community participation and enhance safety.”

Designed to meet LEED for Schools Gold environmental criteria, a key aspect of the project was a 24,600-sf addition to the school’s existing pool complex. The addition’s defining visual features include a dramatically curving roof with clerestory over the new pool, and a glazed curtain wall rising up to match the roof’s curve. The light-filled space creates the ambiance of an outdoor pool for student athletes and spectators.

While the water element is clear in the swimming pools, the fire element factors in with the use of fire-rated glazing systems from Technical Glass Products (TGP).

“We needed to provide a two-hour fire-rated separation between the existing building and the new addition, but we wanted the facility to read as a single aquatics center,” explained Michael Maloney, LEED AP BD+C, design director for Legat Architects. “A visual connection between pools was crucial for the concept, as well as for safety and security. The Fireframes® Curtainwall Series frames and Pilkington Pyrostop® glass from TGP allowed us to meet the fire requirements, while maintaining the visual connection between the existing and new parts of the building.”


TGP’s Fireframes® Curtainwall Series frames
 

Fireframes Curtainwall Series frames are available with fire-ratings up to 120 minutes, and feature narrow profiles to reduce sightlines. The UL classified and labeled steel frames enable large, multi-story expanses of glass in interior and exterior applications. Also available with up to 120 minute fire ratings, Pilkington Pyrostop glazing is impact safety rated and blocks the transfer of radiant heat.

For more information on the Fireframes Curtainwall System and Pilkington Pyrostop, along with TGP’s other fire-rated glass and framing, visit www.fireglass.com

 

Technical Glass Products 

800.426.0279
800.451.9857 – fax
sales@fireglass.com
www.fireglass.com

Related Stories

| Jul 22, 2013

Top K-12 School Sector Construction Firms [2013 Giants 300 Report]

Gilbane, Balfour Beatty, Turner top Building Design+Construction's 2013 ranking of the largest K-12 school sector contractors and construction management firms in the U.S.

| Jul 22, 2013

Top K-12 School Sector Engineering Firms [2013 Giants 300 Report]

AECOM, URS, STV top Building Design+Construction's 2013 ranking of the largest K-12 school sector engineering and engineering/architecture firms in the U.S.

| Jul 22, 2013

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

DLR, SHW top Building Design+Construction's 2013 ranking of the largest K-12 school sector architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 19, 2013

Best in brick: 7 stunning building façades made with brick [slideshow]

The Brick Industry Association named the winners of its 2013 Brick in Architecture Awards. Here are seven winning projects that caught our eye. 

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 17, 2013

DOE launches database on energy performance of 60,000 buildings

The Energy Department today launched a new Buildings Performance Database, the largest free, publicly available database of residential and commercial building energy performance information.

boombox1
boombox2
native1

More In Category




K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021