flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Codes and Standards

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.


By Peter Fabris, Contributing Editor | June 29, 2017

Pixabay Public Domain

The exterior aluminum cladding with flammable polyethylene core used on the Grenfell Tower in London is banned in the US on buildings taller than 40 feet.

The cladding is suspected of being the main factor in creating an inferno that killed at least 79 people in the residential tower. The plastic-and-aluminum panels on Grenfell Tower were reportedly also involved in three catastrophic fires in Dubai. Reports suggest it would have cost an additional £5,000 (about $6,300) for contractors to apply a fire-resistant version of the cladding to the building.

Other factors including the gap between the wall and the rain screen, which could have created a chimney effect and sped flames and smoke up the building’s exterior; ineffectual fire alarms; a lack of sprinklers; and just a single fire stairway instead of multiple ones have been suspected of contributing to the high loss of life.

Thousands of residential high rises across the U.K. are expected to undergo urgent safety reviews as a result of the tragedy.

Related Stories

Codes and Standards | Jan 11, 2021

Zero Energy Buildings growth driven by government policy, stringent codes, technologies

Restraints include high upfront cost, and lack of universal definition and approaches.

Codes and Standards | Jan 11, 2021

HUD releases new Fair Housing Act design and construction requirements

First update of ‘safe harbors’ in 15 years provides better clarity for design and construction firms.

Codes and Standards | Jan 8, 2021

Court ruling gives UpCodes upper hand in fight over building codes database

Battle over IP property claims by ICC and other codes bodies continues.

Codes and Standards | Jan 8, 2021

Houston creates tax incentives for green stormwater elements

Businesses that install green roofs, rain gardens, permeable pavement, and rainwater harvesting are eligible.

Codes and Standards | Jan 7, 2021

Trump’s classical design aesthetic mandate for federal buildings likely to be felt for years

May limit the number of firms that could compete for contracts.

Codes and Standards | Jan 7, 2021

Workers on some of Virginia’s major construction projects sue subcontractors for wage theft

Projects include new General Assembly Building, outpatient facility at Virginia Commonwealth University.

Codes and Standards | Jan 5, 2021

EPA finalizes first major update to Lead and Copper rule

Will accelerate pace of lead service line replacement.

Codes and Standards | Jan 5, 2021

Flood risk for affordable housing expected to triple by 2050

Some communities will have 90% of their affordable housing at risk.

Codes and Standards | Jan 4, 2021

Ranks of remote workers expected to double in five years

Nearly 23% of employees will work from outside of offices.

Codes and Standards | Dec 28, 2020

CSI and ASTM standards can now be connected through a central location

CROSSWALK web service accesses standards specific to projects from feasibility to turnover.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021