flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Codes and Standards

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.


By Peter Fabris, Contributing Editor | June 29, 2017

Pixabay Public Domain

The exterior aluminum cladding with flammable polyethylene core used on the Grenfell Tower in London is banned in the US on buildings taller than 40 feet.

The cladding is suspected of being the main factor in creating an inferno that killed at least 79 people in the residential tower. The plastic-and-aluminum panels on Grenfell Tower were reportedly also involved in three catastrophic fires in Dubai. Reports suggest it would have cost an additional £5,000 (about $6,300) for contractors to apply a fire-resistant version of the cladding to the building.

Other factors including the gap between the wall and the rain screen, which could have created a chimney effect and sped flames and smoke up the building’s exterior; ineffectual fire alarms; a lack of sprinklers; and just a single fire stairway instead of multiple ones have been suspected of contributing to the high loss of life.

Thousands of residential high rises across the U.K. are expected to undergo urgent safety reviews as a result of the tragedy.

Related Stories

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

| Sep 30, 2022

Lab-grown bricks offer potential low-carbon building material

A team of students at the University of Waterloo in Canada have developed a process to grow bricks using bacteria.

| Sep 27, 2022

New Buildings Institute released the Existing Building Decarbonization Code

New Buildings Institute (NBI) has released the Existing Building Decarbonization Code.

| Sep 22, 2022

Gainesville, Fla., ordinance requires Home Energy Score during rental inspections

The city of Gainesville, Florida was recently recognized by the U.S. Dept. of Energy for an adopted ordinance that requires rental housing to receive a Home Energy Score during rental inspections.

| Sep 19, 2022

New York City construction site inspections, enforcement found ‘inadequate’

A new report by the New York State Comptroller found that New York City construction site inspections and regulation enforcement need improvement.

| Sep 16, 2022

Fairfax County, Va., considers impactful code change to reduce flood risk

Fairfax County, Va., in the Washington, D.C., metro region is considering a major code change to reduce the risk from floods.

| Sep 13, 2022

California building codes now allow high-rise mass-timber buildings

California recently enacted new building codes that allow for high-rise mass-timber buildings to be constructed in the state.

| Sep 8, 2022

U.S. construction costs expected to rise 14% year over year by close of 2022

Coldwell Banker Richard Ellis (CBRE) is forecasting a 14.1% year-on-year increase in U.S. construction costs by the close of 2022.

| Aug 29, 2022

Montana becomes first U.S. state to approve 3D printing in construction

Montana is the first U.S. state to give broad regulatory approval for 3D printing in building construction.

| Aug 25, 2022

New York City’s congestion pricing aims to reduce traffic, cut carbon

Officials recently released an environmental assessment that analyzes seven different possible pricing schemes for New York City’s congestion pricing program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021