flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Codes and Standards

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.


By Peter Fabris, Contributing Editor | June 29, 2017

Pixabay Public Domain

The exterior aluminum cladding with flammable polyethylene core used on the Grenfell Tower in London is banned in the US on buildings taller than 40 feet.

The cladding is suspected of being the main factor in creating an inferno that killed at least 79 people in the residential tower. The plastic-and-aluminum panels on Grenfell Tower were reportedly also involved in three catastrophic fires in Dubai. Reports suggest it would have cost an additional £5,000 (about $6,300) for contractors to apply a fire-resistant version of the cladding to the building.

Other factors including the gap between the wall and the rain screen, which could have created a chimney effect and sped flames and smoke up the building’s exterior; ineffectual fire alarms; a lack of sprinklers; and just a single fire stairway instead of multiple ones have been suspected of contributing to the high loss of life.

Thousands of residential high rises across the U.K. are expected to undergo urgent safety reviews as a result of the tragedy.

Related Stories

| Nov 26, 2012

Minnesota law to spur development, job creation produced few jobs

Legislation that allowed local governments to direct excess property tax dollars from tax-increment financing districts into other private developments was supposed to kick-start construction hiring in Minnesota.

| Nov 26, 2012

How to boost resilient systems that are sustainable

Cities of the future can be both more resilient and more sustainable by promoting strategies that include solar power and green roofs, programs that minimize demand for energy, rain gardens, and permeable pavement.

| Nov 26, 2012

Developer of nation’s first LEED platinum skyscraper focuses on carbon reduction

The Durst Organization, the developer of the first LEED platinum certified skyscraper in the country, says it will not seek LEED certification for its residential pyramid planned for New York’s West 57th Street.

| Nov 26, 2012

Questions linger over ability of Miami's newer high-rises to withstand hurricanes

Some towers in Miami, rebuilt after a hurricane in 2005, were allowed to be constructed under older building codes instead of newer ones created after Hurricane Wilma.

| Nov 26, 2012

Changes in development and building standards needed for health of Potomac River

The Potomac River’s health stands to suffer if the region does not change its development and building standards, according to the Potomac Conservancy.

| Nov 16, 2012

South Dakota prefers LEED over building code on state projects

“(LEED is) much better than a mandatory building code because you get a little wiggle room in these projects,” said Mike Mueller, a spokesman for the South Dakota Bureau of Administration.

| Nov 16, 2012

AAMA publishes quality assurance guidelines for Polyamide Thermal Barriers

The American Architectural Manufacturers Association (AAMA) has published QAG-2-12, Voluntary Quality Assurance Processing Guide for Polyamide Thermal Barriers.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021