SAFTI FIRST developed, engineered and successfully tested the first-ever fire and hurricane rated assembly for the Las Olas Beach Club and Condominium, a luxurious multi-family residence in Ft. Lauderdale, Fla.
The architect wanted to design the units with as much glazing as possible so residents can enjoy views of the surrounding area from their home. However, the building codes required the assembly to provide fire and hurricane protection.
To meet all design and code requirements, SAFTI FIRST worked with the entire Building Team to deliver a complete listed and labeled assembly that met the following test standards:
Fire Resistance:
ASTM E-119/UL 263/NFPA 251 for up to 2 hours. Provides full radiant heat protection.
Hurricane Resistance:
TAS 201, TAS 202 and TAS 203 for Miami Dade County.cASTM E-1196, ASTM E-330, ASTM E-1886, ASTM E-283-99, ASTM E-331-00, AAMA 1304-02 for UL Certification.
After successful testing, SAFTI FIRST supplied 76 fire and hurricane window/wall systems rated up to 60 minutes for the individual units and 120-minute fire and hurricane rated assemblies for the lobby area.
Blue-green tint was also applied to the glass as a decorative element.
Project Profile: Las Olas Beach Club and Condominiums in Ft. Lauderdale, FL
Architect: The Sieger Suarez Architectural Partnership
Contract Glazier: RC Aluminum
Product: Fire and Hurricane Rated SuperLite II-XL in SAFTIfire Hurricane Framing
Related Stories
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.