SAFTI FIRST developed, engineered and successfully tested the first-ever fire and hurricane rated assembly for the Las Olas Beach Club and Condominium, a luxurious multi-family residence in Ft. Lauderdale, Fla.
The architect wanted to design the units with as much glazing as possible so residents can enjoy views of the surrounding area from their home. However, the building codes required the assembly to provide fire and hurricane protection.
To meet all design and code requirements, SAFTI FIRST worked with the entire Building Team to deliver a complete listed and labeled assembly that met the following test standards:
Fire Resistance:
ASTM E-119/UL 263/NFPA 251 for up to 2 hours. Provides full radiant heat protection.
Hurricane Resistance:
TAS 201, TAS 202 and TAS 203 for Miami Dade County.cASTM E-1196, ASTM E-330, ASTM E-1886, ASTM E-283-99, ASTM E-331-00, AAMA 1304-02 for UL Certification.
After successful testing, SAFTI FIRST supplied 76 fire and hurricane window/wall systems rated up to 60 minutes for the individual units and 120-minute fire and hurricane rated assemblies for the lobby area.
Blue-green tint was also applied to the glass as a decorative element.
Project Profile: Las Olas Beach Club and Condominiums in Ft. Lauderdale, FL
Architect: The Sieger Suarez Architectural Partnership
Contract Glazier: RC Aluminum
Product: Fire and Hurricane Rated SuperLite II-XL in SAFTIfire Hurricane Framing
Related Stories
| Feb 13, 2014
3 keys to designing freestanding emergency departments
Having physically disassociated from a central hospital, FEDs must overcome the particular challenges associated with a satellite location, namely a lack of awareness, appeal, and credibility. Gresham, Smith & Partners' Kristin Herman-Druc offers three keys to success.
| Feb 13, 2014
Why you should start with a builder
They say the best way to eat an elephant is one bite at a time. Expanding your building or constructing a new structure for your business, church, or school isn’t all that different. Attacking it is best done in small, deliberate pieces.
| Feb 13, 2014
Related Companies, LargaVista partner to develop mixed-use tower in SoHo
The site is located at the gateway to the booming SoHo retail market, where Class A office space is scarce yet highly in demand.
| Feb 12, 2014
First Look: Futuristic Silicon Valley campus designed to draw tech startups
The curved campus will consist of four different buildings, one exclusively for amenities like a coffee bar, bike shop, and bank.
| Feb 12, 2014
IIT's College of Architecture launches the Mies Crown Hall Americas Prize
Awarded biennially with a $50,000 prize, the program will recognize the most distinguished architectural works built on the North and South American continents in the preceding two years.
| Feb 11, 2014
Adobe Photoshop update features new 3D printing capabilities
Available as part of an update to Photoshop Creative Cloud, the tool enables users to easily and reliably build, refine, preview, prepare, and print 3D designs.
| Feb 10, 2014
Proposed parking garage will sandwich vehicles between housing and retail space
Architecture firm Brisac Gonzalez says that the design "will introduce different activities after parking hours."
| Feb 10, 2014
Architecture Design Collaborative announces firm opening in Southern California
Today, Architecture Design Collaborative officially announces the launch of its firm providing a full range of architecture and interior design services nationwide. Architecture Design Collaborative offers architectural design services, comprehensive interior design services, developer collaboration, direct tenant improvement, repositioning and site planning.
| Feb 10, 2014
Ball State to host Geothermal Conference on design, drilling and equipment - April 10, 2014
To best serve the industry, Ball State University has organized a single day conference in which participants will be able to exchange technical notes, develop understandings and share experiences with design, drilling, and equipment issues related to geothermal ground source heat pump technology.
| Feb 7, 2014
DOE, Autodesk team to overhaul the EnergyPlus simulation program
The update will allow a larger ecosystem of developers to contribute updates to the code in order to improve performance and decrease the time required to run energy model simulations.