flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida

Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida


September 23, 2011
Blue-green tint was also applied to the glass as a decorative element.

 

 

 

 

 

 

 

 

SAFTI FIRST developed, engineered and successfully tested the first-ever fire and hurricane rated assembly for the Las Olas Beach Club and Condominium, a luxurious multi-family residence in Ft. Lauderdale, Fla.

The architect wanted to design the units with as much glazing as possible so residents can enjoy views of the surrounding area from their home. However, the building codes required the assembly to provide fire and hurricane protection.
To meet all design and code requirements, SAFTI FIRST worked with the entire Building Team to deliver a complete listed and labeled assembly that met the following test standards:

Fire Resistance:
ASTM E-119/UL 263/NFPA 251 for up to 2 hours. Provides full radiant heat protection.

Hurricane Resistance:
TAS 201, TAS 202 and TAS 203 for Miami Dade County.cASTM E-1196, ASTM E-330, ASTM E-1886, ASTM E-283-99, ASTM E-331-00, AAMA 1304-02 for UL Certification.

After successful testing, SAFTI FIRST supplied 76 fire and hurricane window/wall systems rated up to 60 minutes for the individual units and 120-minute fire and hurricane rated assemblies for the lobby area.
Blue-green tint was also applied to the glass as a decorative element.

Project Profile:  Las Olas Beach Club and Condominiums in Ft. Lauderdale, FL
Architect:  The Sieger Suarez Architectural Partnership
Contract Glazier:  RC Aluminum
Product:  Fire and Hurricane Rated SuperLite II-XL in SAFTIfire Hurricane Framing

Related Stories

Giants 400 | Aug 7, 2015

GOVERNMENT SECTOR GIANTS: Public sector spending even more cautiously on buildings

AEC firms that do government work say their public-sector clients have been going smaller to save money on construction projects, according to BD+C's 2015 Giants 300 report.

Giants 400 | Aug 7, 2015

K-12 SCHOOL SECTOR GIANTS: To succeed, school design must replicate real-world environments

Whether new or reconstructed, schools must meet new demands that emanate from the real world and rapidly adapt to different instructional and learning modes, according to BD+C's 2015 Giants 300 report.

Giants 400 | Aug 7, 2015

MULTIFAMILY AEC GIANTS: Slowdown prompts developers to ask: Will the luxury rentals boom hold?

For the last three years, rental apartments have occupied the hot corner in residential construction, as younger people gravitated toward renting to be closer to urban centers and jobs. But at around 360,000 annual starts, multifamily might be peaking, according to BD+C's 2015 Giants 300 report.

Giants 400 | Aug 7, 2015

UNIVERSITY SECTOR GIANTS: Collaboration, creativity, technology—hallmarks of today’s campus facilities

At a time when competition for the cream of the student/faculty crop is intensifying, colleges and universities must recognize that students and parents are coming to expect an education environment that foments collaboration, according to BD+C's 2015 Giants 300 report.

Giants 400 | Aug 7, 2015

RECONSTRUCTION AEC GIANTS: Restorations breathe new life into valuable older buildings

AEC Giants discuss opportunities and complications associated with renovation, restoration, and adaptive reuse construction work.

BIM and Information Technology | Aug 6, 2015

After refueling its capital tank, WeWork acquires BIM consultant Case

The merger is expected to help standardize how WeWork designs and builds out office space. 

Giants 400 | Aug 6, 2015

BIM GIANTS: Robotic reality capture, gaming systems, virtual reality—AEC Giants continue tech frenzy

Given their size, AEC Giants possess the resources and scale to research and test the bevy of software and hardware solutions on the market. Some have created internal innovation labs and fabrication shops to tinker with emerging technologies and create custom software tools. Others have formed R&D teams to test tech tools on the job site.

Giants 400 | Aug 6, 2015

GIANTS 300 REPORT: Top 115 Healthcare Architecture Firms

HDR, Stantec, and Perkins+Will top Building Design+Construction's 2015 ranking of the largest healthcare architecture and architecture/engineering firms in the U.S. 

Giants 400 | Aug 6, 2015

HEALTHCARE AEC GIANTS: Hospital and medical office construction facing a slow but steady recovery

Construction of hospitals and medical offices is expected to shake off its lethargy in 2015 and recover modestly over the next several years, according to BD+C's 2015 Giants 300 report.

Codes and Standards | Aug 6, 2015

ConsensusDocs releases new CM agency contract standard agreement

For use when owner acts as the construction manager, hires a construction manager, or uses multiple prime contractors

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.


Cultural Facilities

Baltimore’s National Aquarium opens 10,000-sf floating wetland that mimics the harbor’s original tidal marsh habitat

The National Aquarium in Baltimore has opened the National Aquarium Harbor Wetland, a 10,000-sf floating wetland that mimics the Inner Harbor’s original Chesapeake Bay tidal marsh habitat. Located between Piers 3 and 4 on Baltimore’s Inner Harbor, the $14 million project features more than 32,000 native shrubs and marsh grasses. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â