flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Finalized 2021 Energy Code leaves out future-proofing provision

Codes and Standards

Finalized 2021 Energy Code leaves out future-proofing provision

Appeals process nixed requirement for residential electrification readiness.


By Peter Fabris, Contributing Editor | November 30, 2020

Courtesy Pixabay

The final 2021 International Energy Conservation Code (IECC) for new residential and commercial buildings has been finalized.

The new code contains significant energy efficiency gains, including options for constructing zero energy homes and commercial buildings, but omits “the most innovative and forward-looking proposals,” writes Laura Urbanek of the Natural Resources Defense Council. Among the proposals that didn’t get approved was one that mandated residential electrification readiness (e.g., constructing a home so that it is easy to replace gas appliances with efficient and lower-carbon electric options in the future).

Also eliminated were provisions for electric vehicle readiness for homes and commercial buildings, efficiency requirements for residential water heaters, and a prohibition on continuously burning pilot lights. Builders and construction industry groups were able to remove these measures in the appeals process of the code’s development.

The code does notably upgrade several requirements for new buildings, though. “Of the 21 proposals that were appealed, 17 will remain in the final code, which will substantially increase the efficiency of new homes built to the 2021 IECC,” according to Urbanek.

Related Stories

Codes and Standards | Jul 26, 2019

Floating landscape infrastructure wins top ASCE innovation prize

Climate resiliency a key theme of entrants.

Codes and Standards | Jul 24, 2019

New York making slow progress on resiliency seven years after Hurricane Sandy

Property owners face many challenges; coastal defense project plans are complex and need more time to plan.

Codes and Standards | Jul 23, 2019

Berkeley, Calif. passes nation’s first ordinance to make new buildings all-electric

No gas hook-ups will be allowed in new houses, apartments, and commercial buildings.

Codes and Standards | Jul 22, 2019

San Francisco office building is city’s first structure certified by BREEAM USA for existing buildings

The Landmark @ One Market is one of San Francisco’s most architecturally distinctive buildings.

Codes and Standards | Jul 15, 2019

USGBC calls for proposals for feedback, concepts for next LEED version

The move follows successful public input on LEED 4.1.

AEC Tech | Jul 15, 2019

Lack of standards hampers development of exoskeleton industry

Guidelines, common terminology, and testing methodology are needed, says expert. 

Concrete | Jul 8, 2019

Concrete repair code requirements released

American Concrete Institute offers guidance on assessment, repair, rehab of existing concrete structures.

K-12 Schools | Jul 8, 2019

Collaborative for High Performance Schools releases 2019 Core Criteria Version 3.0 Update

The update adds credits to lower carbon footprints and to promote climate change resiliency.

Wood | Jul 8, 2019

Campaign launched to promote ‘climate-smart wood’

The Forest Stewardship Council and other groups aim to help buyers understand and make it easier to locate lumber that meets sustainable forestry standards.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021