flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Finalized 2021 Energy Code leaves out future-proofing provision

Codes and Standards

Finalized 2021 Energy Code leaves out future-proofing provision

Appeals process nixed requirement for residential electrification readiness.


By Peter Fabris, Contributing Editor | November 30, 2020

Courtesy Pixabay

The final 2021 International Energy Conservation Code (IECC) for new residential and commercial buildings has been finalized.

The new code contains significant energy efficiency gains, including options for constructing zero energy homes and commercial buildings, but omits “the most innovative and forward-looking proposals,” writes Laura Urbanek of the Natural Resources Defense Council. Among the proposals that didn’t get approved was one that mandated residential electrification readiness (e.g., constructing a home so that it is easy to replace gas appliances with efficient and lower-carbon electric options in the future).

Also eliminated were provisions for electric vehicle readiness for homes and commercial buildings, efficiency requirements for residential water heaters, and a prohibition on continuously burning pilot lights. Builders and construction industry groups were able to remove these measures in the appeals process of the code’s development.

The code does notably upgrade several requirements for new buildings, though. “Of the 21 proposals that were appealed, 17 will remain in the final code, which will substantially increase the efficiency of new homes built to the 2021 IECC,” according to Urbanek.

Related Stories

Codes and Standards | Jun 2, 2021

Dept. of Energy releases EnergyPlus and OpenStudio updates

New features include Python Plugin features and additional tabular reporting options.

Codes and Standards | Jun 1, 2021

Federal plan to double Canadian lumber tariffs draws intense criticism

Builders advised to stock up to deal with shortages.

Codes and Standards | Jun 1, 2021

Passive House standards proving their worth in multifamily sector

Energy performance beats conventionally built by 32% to 58%.

Codes and Standards | May 27, 2021

Pittsburgh combats construction fraud

Crackdown on tax, insurance, and workers’ comp malfeasance.

Codes and Standards | May 26, 2021

Proposal to add photovoltaic panels to the R2 Standard for electronics recycling

Hundreds of facilities in 33 countries could begin recycling PVs.

Codes and Standards | May 25, 2021

International Energy Agency lays out roadmap to net zero

Focus is on energy generation, but building efficiency also plays a role.

Codes and Standards | May 24, 2021

Biden Administration will make new investments in building energy efficiency

Focus on grid-interactive buildings; Energy Star expansion; new targets for energy, water reduction.

Codes and Standards | May 20, 2021

Solar panel trade group issues guidelines to rid use of components built with forced labor

Growing concern that PV industry is dependent on work camps in China.

Codes and Standards | May 19, 2021

Smart electric panels can aid transition to renewable energy

Allow customers better control of circuits; utilities can better manage demand.

Codes and Standards | May 18, 2021

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021