flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Final call for entries! BUILDINGChicago 2014 call for educational proposals

Final call for entries! BUILDINGChicago 2014 call for educational proposals

The second annual conference and exposition will take place September 29 - October 1, 2014 in Chicago. Proposals are due March 14, 2014.


By BD+C Staff | March 12, 2014

The Advisory Committee of the BUILDINGChicago/Greening the Heartland 2014 Conference is accepting proposals for presenters and topics through this Friday, March 14.

Now in its second year, the event is sponsored by Building Design+Construction magazine, AIA Chicago, the Builders Association, USGBC-Illinois, and the Greening the Heartland Committee. It will take place September 29-October 1, 2014, at North America’s largest LEED Gold-certified hotel, the Holiday Inn Chicago Mart Plaza.

(See BD+C's coverage of BUILDINGChicago 2013)

The BUILDINGChicago track will provide a wide variety of educational and networking opportunities built upon BD+C’s strong track record of high-quality, AIA-accredited education through its BD+C University. The online university offers a convenient educational platform, available 24/7 from anywhere in the world, to architects, engineers, contractors, and building owners/developers who specialize in the commercial, industrial, and institutional markets.

The Greening the Heartland track will explore interdependent elements of sustainability. Green buildings are critical components in the design of sustainable communities that rely on pathways and infrastructure — watts, water, waste, and wheels. Providing buildings with clean energy, clean water, and efficient use of materials, while minimizing waste, results in truly green buildings and sustainable developments that bring people together to work, play, learn, and live.

All proposals must be submitted online at BuildingChicagoExpo.com.

Submitters may return to their uploaded and saved proposals for editing any time up until the submission deadline of midnight, CST, March, 2014. Faxed or mailed proposals will not be accepted. 

For more information, contact Harry Urban, SGC/SGC Horizon vice president of events, at hurban@sgcmail.com; 847.954.7928.

Related Stories

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 12, 2011

Bulley & Andrews celebrates 120 years of construction

The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction. 

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Oct 11, 2011

AIA introduces five new documents for use on sustainable projects

These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

| Oct 11, 2011

Ballard Spahr launches real estate recovery group

  The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment. 

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021