flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Final call for entries: 2014 Giants 300 survey

Final call for entries: 2014 Giants 300 survey

The Giants 300 survey results will be published in the July 2014 issue of Building Design+Construction.


By BD+C Staff | May 11, 2014

The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. You’ll want to be sure your firm is on the Giants 300 list, as potential clients look to these rankings for prospective firms to design and construct their future projects.

Giants 300 results will be published in our July 2014 issue.

 

CLICK HERE TO DOWNLOAD THE 2014 GIANTS 300 SURVEY

 

NOTE: The Excel document has multiple tabs. If you do not see the tabs at the bottom of the worksheet, go to the “view” tab on the menu and select “full screen." You should see six tabs at the bottom.

Completed surveys must be returned by Wednesday, May 21, 2014.

Please fill out the survey form and attach it in an email to BOTH dbarista@sgcmail.com and bdcGiants2014@sgcmail.com.


There are two additional ways to participate in the July Giants 300 report:  

1. SUBMIT YOUR LATEST PROJECT PHOTOS FOR CONSIDERATION
As in years past, we're looking for great project photos for use in the July Giants issue, including on the cover. Please email your photo submissions to me (dbarista@sgcmail.com) by May 21. If possible, please include a short description of each image, with the project name and location and key Building Team members (owner/client, architect, structural engineer, MEP engineer, and contractor) 

2. SUBMIT YOUR IDEAS FOR THE JULY GIANTS ISSUE EDITORIAL COVERAGE
The editors would like to hear from your AEC teams on the latest trends, projects, and innovations across a number of major building sectors that will be covered in the July Giants issue. They include: healthcare, K-12 schools, higher education, data centers, multifamily, government, reconstruction, office, hospitality/hotels, green, BIM/VDC, military, and science and technology. Please email a short summary (and photos, if applicable) of your trends/innovations/projects for any of these sectors to dbarista@sgcmail.com by May 7.   

Questions? Contact David Barista, Editor-in-Chief, at dbarista@sgcmail.com or 847-954-7929.

Related Stories

| Jun 14, 2012

Viscardi joins LEO A DALY as VP, corporate director of aviation programs

Viscardi will be responsible for providing the vision and strategy for growing the firm’s aviation practice, identifying and establishing new clients, as well as maintaining existing client relationships.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 30, 2012

Construction milestone reached for $1B expansion of San Diego International Airport

Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 27, 2012

Skanska hires aviation construction expert Bob Postma

Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.

| Jan 4, 2012

New LEED Silver complex provides space for education and research

The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Airports

SOM unveils ‘branching’ structural design for new Satellite Concourse 1 at O’Hare Airport

The Chicago Department of Aviation has revealed the design for Satellite Concourse 1 at O’Hare International Airport, one of the nation’s business airports. Designed by Skidmore, Owings & Merrill (SOM), with Ross Barney Architects, Juan Gabriel Moreno Architects (JGMA), and Arup, the concourse will be the first new building in the Terminal Area Program, the largest concourse area expansion and revitalization in the airport’s almost seven-decade history. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021