flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Final call for entries: 2014 Giants 300 survey

Final call for entries: 2014 Giants 300 survey

The Giants 300 survey results will be published in the July 2014 issue of Building Design+Construction.


By BD+C Staff | May 11, 2014

The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. You’ll want to be sure your firm is on the Giants 300 list, as potential clients look to these rankings for prospective firms to design and construct their future projects.

Giants 300 results will be published in our July 2014 issue.

 

CLICK HERE TO DOWNLOAD THE 2014 GIANTS 300 SURVEY

 

NOTE: The Excel document has multiple tabs. If you do not see the tabs at the bottom of the worksheet, go to the “view” tab on the menu and select “full screen." You should see six tabs at the bottom.

Completed surveys must be returned by Wednesday, May 21, 2014.

Please fill out the survey form and attach it in an email to BOTH dbarista@sgcmail.com and bdcGiants2014@sgcmail.com.


There are two additional ways to participate in the July Giants 300 report:  

1. SUBMIT YOUR LATEST PROJECT PHOTOS FOR CONSIDERATION
As in years past, we're looking for great project photos for use in the July Giants issue, including on the cover. Please email your photo submissions to me (dbarista@sgcmail.com) by May 21. If possible, please include a short description of each image, with the project name and location and key Building Team members (owner/client, architect, structural engineer, MEP engineer, and contractor) 

2. SUBMIT YOUR IDEAS FOR THE JULY GIANTS ISSUE EDITORIAL COVERAGE
The editors would like to hear from your AEC teams on the latest trends, projects, and innovations across a number of major building sectors that will be covered in the July Giants issue. They include: healthcare, K-12 schools, higher education, data centers, multifamily, government, reconstruction, office, hospitality/hotels, green, BIM/VDC, military, and science and technology. Please email a short summary (and photos, if applicable) of your trends/innovations/projects for any of these sectors to dbarista@sgcmail.com by May 7.   

Questions? Contact David Barista, Editor-in-Chief, at dbarista@sgcmail.com or 847-954-7929.

Related Stories

Hotel Facilities | Jul 5, 2017

It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension

PPVC techniques allowed the project to save time and manpower.

Airports | Jun 26, 2017

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

The project includes a new 1 million-sf terminal building with 33 domestic aircraft gates.

Building Team Awards | Jun 8, 2017

Missing link: Denver International Airport and Transit Center

Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.

Airports | May 15, 2017

Five trends for airport retail

CallisonRTKL Vice President Kevin Horn pinpoints how travel retail is changing dramatically.

Reconstruction & Renovation | Mar 16, 2017

Pols are ready to spend $1T on rebuilding America’s infrastructure. But who will pick which projects benefit?

The accounting and consulting firm PwC offers the industrial sector a five-step approach to getting more involved in this process.

Airports | Feb 23, 2017

New Orleans Airport to add five additional gates and $110 million to current expansion

The project is being hailed as the city’s most transformative since the construction of the Superdome.

Projects | Jan 25, 2017

Trump prioritizes infrastructure projects, as rebuilding America is now a hot political potato

Both parties are talking about $1 trillion in spending over the next decade. How projects will be funded, though, remains unresolved.

Airports | Jan 17, 2017

JFK Airport set for $10 billion renovation

In addition to the airport itself, the overhaul will also improve road and rail access to meet projected passenger growth.

Airports | Dec 6, 2016

Phoenix Sky Harbor International Airport creates a destination inside Terminal 3

DWL Architects, SmithGroupJJR, and Corgan design passenger experience that connects to the surrounding city and Sonoran desert landscape.

Airports | Nov 1, 2016

FAA forecasts a modest dip in spending for airports over next five years

Latest report based on surveys of 3,340 existing and proposed public-use airports.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Airports

SOM unveils ‘branching’ structural design for new Satellite Concourse 1 at O’Hare Airport

The Chicago Department of Aviation has revealed the design for Satellite Concourse 1 at O’Hare International Airport, one of the nation’s business airports. Designed by Skidmore, Owings & Merrill (SOM), with Ross Barney Architects, Juan Gabriel Moreno Architects (JGMA), and Arup, the concourse will be the first new building in the Terminal Area Program, the largest concourse area expansion and revitalization in the airport’s almost seven-decade history. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021