BD+C’s sister publication, Construction Equipment, recently field tested Caterpillar’s entry into the rugged mobile device market, the Cat B15 smartphone.
Manufactured by Bullett Mobile Ltd. under license from Caterpillar, the B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.”
Among the listed features are drop-resistance up to 1.8 meters (nearly five feet), water resistant (submerged up to one meter for 30 minutes), imperviousness to dust, and easy wet-finger tracking ability. The phone starts at $349 and ships unlocked to work with any carrier.
CE Contributing Editor and long-time construction industry professional Pat Crail put the Cat B15 through the paces to see if it actually lived up to the company’s claims. Crail offered the following feedback:
• Wet fingers? No problem. “The first rugged feature that I tested was wet-screen finger tracking on the VGA touch screen. I have used several other touch-screen phones and have always had difficulty with wet-finger tracking, especially if there is any oil or grease present. The B15 masterfully handles wet finger gestures on its screen, even with some oil residue or grease on the fingers.”
• Built to take a beating. “I then tested the phone’s ability to handle the 1.8-meter drop onto a concrete surface. Its aluminum-and-rubber construction lived up to claims. I dropped the phone from 1.8 meters a number of times, with no apparent damage.”
• Passed the water test. “After submerging the Cat B15 for 30 minutes in a meter of water, I pulled it out, shook off the excess moisture, and was able to use the phone immediately for both voice calls and Internet connectivity. I repeated this trial a few times over the several months of testing. To its credit, the B15 easily handled multiple submersions over the three months I used it.”
• Lack of 4G could be an issue for some. “The B15 seemed a bit sluggish when opening large, photo-heavy Web pages and video files, likely a result of the phone’s lack of 4G connectivity. The B15 operates on the latest version of Android and supports 3G wireless connections. According to Caterpillar’s Sarah Crab, there are no plans for the B15 to support LTE (4G) data connections.”
Read CE’s full report. For more on the B15, visit Catphones.com/phones/b15-smartphone.aspx.
Related Stories
| Dec 29, 2014
14 great solutions for the commercial construction market
Ideas are cheap. Solutions are what count. The latest installment in BD+C's Great Solutions series presents 14 ways AEC professionals, entrepreneurs, and other clever folk have overcome what seemed to be insoluble problems—from how to make bricks out of agricultural waste, to a new way to keep hospitals running clean during construction.
| Dec 29, 2014
HealthSpot station merges personalized healthcare with videoconferencing [BD+C's 2014 Great Solutions Report]
The HealthSpot station is an 8x5-foot, ADA-compliant mobile kiosk that lets patients access a network of board-certified physicians through interactive videoconferencing and medical devices. It was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 28, 2014
Robots, drones, and printed buildings: The promise of automated construction
Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.
BIM and Information Technology | Dec 28, 2014
The Big Data revolution: How data-driven design is transforming project planning
There are literally hundreds of applications for deep analytics in planning and design projects, not to mention the many benefits for construction teams, building owners, and facility managers. We profile some early successful applications.
| Dec 28, 2014
AIA course: Enhancing interior comfort while improving overall building efficacy
Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.
| Dec 28, 2014
6 trends steering today's college residence halls
University students want more in a residence hall than just a place to sleep. They want a space that reflects their style of living and learning.
| Dec 28, 2014
Using energy modeling to increase project value [AIA course]
This course, worth 1.0 AIA LU/HSW, explores how to increase project value through energy modeling, as well as how to conduct quick payback and net present value studies to identify which energy strategies are most viable for the project.
| Dec 28, 2014
The lowdown on LODs: Bringing clarity to BIM
These days, BIM is par for the course across most facets of design. But a lot of the conversation surrounding BIM still lacks clarity due to ambiguous terminology, a lack of clear-cut guiding illustrations, and widely varying implementation, writes GS&P's John Scannell.
| Dec 28, 2014
The future of airport terminal design: destination status, five-star amenities, stress-free travel
Taking a cue from the hospitality industry, airport executives are seeking to make their facilities feel more like destinations, writes HOK's Richard Gammon.
| Dec 28, 2014
10 key design interventions for a healthier, happier, and more productive workplace
Numerous studies and mountains of evidence confirm what common sense has long suggested: healthy, happier workers are more productive, more likely to collaborate with colleagues, and more likely to innovate in ways that benefit the bottom line, writes Gensler's Kirsten Ritchie.