flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Field tested: Caterpillar’s Cat B15 rugged smartphone

Field tested: Caterpillar’s Cat B15 rugged smartphone

The B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.” 


By BD+C Staff | March 10, 2014
Caterpillars Cat B15 rugged smartphone
Caterpillars Cat B15 rugged smartphone

BD+C’s sister publication, Construction Equipment, recently field tested Caterpillar’s entry into the rugged mobile device market, the Cat B15 smartphone

Manufactured by Bullett Mobile Ltd. under license from Caterpillar, the B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.” 

Among the listed features are drop-resistance up to 1.8 meters (nearly five feet), water resistant (submerged up to one meter for 30 minutes), imperviousness to dust, and easy wet-finger tracking ability. The phone starts at $349 and ships unlocked to work with any carrier.

CE Contributing Editor and long-time construction industry professional Pat Crail put the Cat B15 through the paces to see if it actually lived up to the company’s claims. Crail offered the following feedback:

• Wet fingers? No problem. “The first rugged feature that I tested was wet-screen finger tracking on the VGA touch screen. I have used several other touch-screen phones and have always had difficulty with wet-finger tracking, especially if there is any oil or grease present. The B15 masterfully handles wet finger gestures on its screen, even with some oil residue or grease on the fingers.”

• Built to take a beating. “I then tested the phone’s ability to handle the 1.8-meter drop onto a concrete surface. Its aluminum-and-rubber construction lived up to claims. I dropped the phone from 1.8 meters a number of times, with no apparent damage.”

• Passed the water test. “After submerging the Cat B15 for 30 minutes in a meter of water, I pulled it out, shook off the excess moisture, and was able to use the phone immediately for both voice calls and Internet connectivity. I repeated this trial a few times over the several months of testing. To its credit, the B15 easily handled multiple submersions over the three months I used it.”

• Lack of 4G could be an issue for some. “The B15 seemed a bit sluggish when opening large, photo-heavy Web pages and video files, likely a result of the phone’s lack of 4G connectivity. The B15 operates on the latest version of Android and supports 3G wireless connections. According to Caterpillar’s Sarah Crab, there are no plans for the B15 to support LTE (4G) data connections.”

Read CE’s full report. For more on the B15, visit Catphones.com/phones/b15-smartphone.aspx.

Related Stories

Architects | May 31, 2016

JLG Architects acquires Minneapolis-based Studio Five Architects

Led by Linda McCracken-Hunt, SFA is one of Minnesota’s oldest woman-owned architecture firms.

Building Team Awards | May 31, 2016

Gonzaga's new student center is a bustling social hub

Retail mall features, comfortable furniture, and floor-to-ceiling glass add vibrancy to the new John J. Hemmingson Center.

Building Team Awards | May 27, 2016

Big police academy trains thousands of New York's finest

The Police Training Academy in Queens, N.Y., consists of a 480,000-sf academic/administration building and a 240,000-sf physical training facility, linked by an aerial pedestrian bridge.

Building Team Awards | May 26, 2016

Cimpress office complex built during historically brutal Massachusetts winter

Lean construction techniques were used to build 275 Wyman Street during a winter that brought more than 100 inches of snow to suburban Boston.

Building Team Awards | May 25, 2016

New health center campus provides affordable care for thousands of Northern Californians

The 38,000-sf, two-level John & Susan Sobrato Campus in Palo Alto is expected to serve 25,000 patients a year by the end of the decade.

Architects | May 24, 2016

Lissoni Architettura’s NYC Aquatrium takes first place in New York City Waterfront Design competition

NYC Aquatrium was selected from among 178 proposals from 40 countries as the winner of Arch Out Loud’s NYC Aquarium & Public Waterfront design competition

Building Team Awards | May 24, 2016

Los Angeles bus depot squeezes the most from a tight site

The Building Team for the MTA Division 13 Bus Operations and Maintenance Facility fit 12 acres’ worth of programming in a multi-level structure on a 4.8-acre site.

Building Team Awards | May 23, 2016

'Greenest ballpark' proves a winner for St. Paul Saints

Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.

Architects | May 20, 2016

NCARB survey indicates continued growth of U.S. architects

The number of U.S. architects surpassed 110,000 in 2015, a 2% increase from the previous year.

Multifamily Housing | May 19, 2016

Architect Jean Nouvel designs flood-resilient Monad Terrace in Miami Beach

A man-made lagoon with lush vegetation at the base of the complex is expected to adapt to climate change and rising sea levels.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021