flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A few ways contractors can manage COVID-19 risks

Codes and Standards

A few ways contractors can manage COVID-19 risks

Staggered start times, rigorous tool cleaning, virtual training among the strategies.


By Peter Fabris, Contributing Editor | May 6, 2020
Contractors framing

Courtesy Pixabay

Contractors have devised new procedures to manage the risk to employees of COVID-19 exposure.

The goal is to alter project management and safety protocols to enable social distancing and enhance hygiene on job sites. Some contractors have added shifts and staggered start times and lunch breaks to reduce the number of workers on site at any given time.

Some contractors have stationed staff with no-touch thermometers to check workers’ temperatures. If workers are running a fever, they are asked to return home to self-quarantine.

Some employers have rented additional wash stations so that workers don’t have to walk as far to wash their hands. Crews are avoiding sharing tools and making sure they clean tools between uses. Another strategy: using tablets for safety training and orientation with modules that emphasize hygiene measures and social distancing.

Related Stories

| Nov 16, 2012

South Dakota prefers LEED over building code on state projects

“(LEED is) much better than a mandatory building code because you get a little wiggle room in these projects,” said Mike Mueller, a spokesman for the South Dakota Bureau of Administration.

| Nov 16, 2012

AAMA publishes quality assurance guidelines for Polyamide Thermal Barriers

The American Architectural Manufacturers Association (AAMA) has published QAG-2-12, Voluntary Quality Assurance Processing Guide for Polyamide Thermal Barriers.

| Nov 16, 2012

New ANSI/BIFMA standards developed for educational seating

The American National Standards Institute (ANSI) has approved the newly developed safety and performance standard for educational seating: ANSI/BIFMA X6.1-2012—the first of its kind.

| Nov 16, 2012

Green building councils in 62 countries expect 60% of their work to be green by 2015

More than half of the respondents to a survey of members of the Green Building Council in 62 countries expect green projects to comprise 60% of their work by 2015.

| Nov 16, 2012

Voters approve fewer construction ballot measures in 2012 than in 2008

Voters passed fewer ballot measures related to construction projects this year than they did in 2008, according to an analysis by the Associated General Contractors of America.

| Nov 9, 2012

New ANSI/BIFMA standard adds point for lower formaldehyde emissions

The ANSI/BIFMA e3-2012 Furniture Sustainability Standard now includes an additional point for furniture products that meet a new, lower formaldehyde emissions limit.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021