flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A few ways contractors can manage COVID-19 risks

Codes and Standards

A few ways contractors can manage COVID-19 risks

Staggered start times, rigorous tool cleaning, virtual training among the strategies.


By Peter Fabris, Contributing Editor | May 6, 2020
Contractors framing

Courtesy Pixabay

Contractors have devised new procedures to manage the risk to employees of COVID-19 exposure.

The goal is to alter project management and safety protocols to enable social distancing and enhance hygiene on job sites. Some contractors have added shifts and staggered start times and lunch breaks to reduce the number of workers on site at any given time.

Some contractors have stationed staff with no-touch thermometers to check workers’ temperatures. If workers are running a fever, they are asked to return home to self-quarantine.

Some employers have rented additional wash stations so that workers don’t have to walk as far to wash their hands. Crews are avoiding sharing tools and making sure they clean tools between uses. Another strategy: using tablets for safety training and orientation with modules that emphasize hygiene measures and social distancing.

Related Stories

Codes and Standards | Dec 11, 2018

Strict seismic building codes credited with minimizing damage in Alaskan earthquake

Magnitude 7.0 temblor cracked roads and collapsed road ramps, but buildings held up well.

Codes and Standards | Dec 7, 2018

Florida tops ABC’s 2018 Merit Shop Scorecard rankings

Michigan rose fastest after passing prevailing wage law.

Codes and Standards | Dec 6, 2018

North American steel yields lower GHG emissions than Chinese steel

North American construction steel saves about half of GHG emissions on building project.

Codes and Standards | Dec 5, 2018

Canadian retailer builds net-zero stores

Other chains also boost green efforts with PVs, EV charging stations.

Codes and Standards | Dec 4, 2018

Action on building codes would spur low-carbon cities

Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.

Codes and Standards | Nov 30, 2018

Best solution to prevent California wildfire disasters: Stop building in places likely to burn

Approach would be unpopular as people attracted to stunning wooded landscapes.

Codes and Standards | Nov 29, 2018

USGBC and BRE form partnership

Two green standards groups will collaborate on standards, platforms, and research.

Codes and Standards | Nov 29, 2018

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.

Codes and Standards | Nov 28, 2018

To build water-efficient cities, water managers and urban planners must coordinate better

Lack of time and resources, and practitioners not in habit of working together hamper efforts.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021