flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fenestration Alliance updates standard for mulled combination assemblies

Codes and Standards

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.


By Peter Fabris, Contributing Editor | February 1, 2021

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) updated a mulled assemblies document: AAMA 450-20, Performance Rating Method for Mulled Combination Assemblies, Composite Units, and Other Mulled Fenestration Systems.

The document was last updated in 2010. The performance rating method describes procedures and requirements for determining the air leakage, water resistance, and structural performance of mulled fenestration systems.

The document includes test procedures and calculation procedures for determining the performance of mulled fenestration systems. Mulled fenestration systems may be factory assembled or assembled onsite with parts and instructions supplied by the product manufacturer.

“The North American Fenestration Standard says that ‘mullion ratings shall be determined according to the requirements and procedures of AAMA 450 for both composite units and mulled combination assemblies.’ However, until now, AAMA 450 provided no guidance for composite units,” said Dave Goldsmith (PlyGem), co-chair of the FGIA Requirements for Mulled and Combination Window Assembly Update Task Group. “This document will put powerful new tools into the hands of engineers to assist them in determining how to construct structurally sound and weatherproof fenestration products in the most economical ways, and should also drastically reduce the amount of testing required to validate a large variety of composite unit configurations,” Goldsmith said.

Related Stories

Codes and Standards | Aug 25, 2020

Platform will allow researchers to test energy system integration at scale

The U.S. Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL) recently launched the Advanced Research on Integrated Energy Systems (ARIES) platform.

Codes and Standards | Aug 20, 2020

Wariness of elevators may stymie office reopening

Workers could balk at returning to high-rises.

Codes and Standards | Aug 18, 2020

Florida becomes the third state to adopt concrete repair code

Sets minimum requirements for design, construction, repair of concrete structural elements in buildings.

Codes and Standards | Aug 17, 2020

ASCE seeks comments on seismic standard

Pertains to design criteria for nuclear facilities.

Codes and Standards | Aug 13, 2020

COVID-19 reboot guide offers strategies for reopening K-12 schools

Looks at space considerations for reopening at different scales.

Codes and Standards | Aug 12, 2020

Document provides guidance for mass timber construction

Overview of Intl. Building Code requirements included.

Codes and Standards | Aug 11, 2020

Inefficient air conditioning is a key contributor to global warming

More efficient equipment and buildings could make a big difference.

Codes and Standards | Aug 10, 2020

Concrete Institute and Post-Tensioning Institutes expand partnership

Will collaborate on new structural post-tensioned concrete code requirements.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021