flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

Codes and Standards

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.


By Peter Fabris, Contributing Editor | October 18, 2018

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.

Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.

President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.

Related Stories

Codes and Standards | Jul 29, 2019

ASCE group unveils structural safety database

Confidential reporting on structural failures, near misses, and other incidents.

Codes and Standards | Jul 26, 2019

Floating landscape infrastructure wins top ASCE innovation prize

Climate resiliency a key theme of entrants.

Codes and Standards | Jul 24, 2019

New York making slow progress on resiliency seven years after Hurricane Sandy

Property owners face many challenges; coastal defense project plans are complex and need more time to plan.

Codes and Standards | Jul 23, 2019

Berkeley, Calif. passes nation’s first ordinance to make new buildings all-electric

No gas hook-ups will be allowed in new houses, apartments, and commercial buildings.

Codes and Standards | Jul 22, 2019

San Francisco office building is city’s first structure certified by BREEAM USA for existing buildings

The Landmark @ One Market is one of San Francisco’s most architecturally distinctive buildings.

Codes and Standards | Jul 15, 2019

USGBC calls for proposals for feedback, concepts for next LEED version

The move follows successful public input on LEED 4.1.

AEC Tech | Jul 15, 2019

Lack of standards hampers development of exoskeleton industry

Guidelines, common terminology, and testing methodology are needed, says expert. 

Concrete | Jul 8, 2019

Concrete repair code requirements released

American Concrete Institute offers guidance on assessment, repair, rehab of existing concrete structures.

K-12 Schools | Jul 8, 2019

Collaborative for High Performance Schools releases 2019 Core Criteria Version 3.0 Update

The update adds credits to lower carbon footprints and to promote climate change resiliency.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021