Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.
One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.
Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.
President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.
Related Stories
Codes and Standards | Nov 11, 2019
U.S. hotel construction pipeline continues its year-over-year growth
In its eighth consecutive quarter of growth, projects currently under construction stand at 1,729 projects/235,278 rooms.
Codes and Standards | Nov 11, 2019
New retrofit design guide for metal roofing published
Metal Construction Association document provides best practices for re-roofing with metal.
Codes and Standards | Nov 8, 2019
New York City among the top hotel construction pipelines in the United States
Hotels presently under construction are at 102 projects/17,504 rooms.
Codes and Standards | Nov 7, 2019
Group focused on using AI for construction safety gains key members
Major contractors join partnership to share data to predict hazards, incidents.
Codes and Standards | Nov 6, 2019
Undisclosed ICC agreement with NAHB alleged to thwart more stringent efficiency codes
Homebuilders’ seats on ICC made it easier to block new provisions, report alleges.
Codes and Standards | Nov 4, 2019
ASHRAE releases new version of energy efficiency standard for buildings
Standard 90.1 includes revisions of envelope, lighting, HVAC provisions.
Codes and Standards | Nov 1, 2019
Resiliency of a community’s housing stock can be measured according to new benchmark
Metric can help municipalities prepare for disasters.
Codes and Standards | Oct 31, 2019
FEMA, ICC release updated guide on integrating I-Codes into floodplain management regulations
Provides advice on satisfying requirements for the National Flood Insurance Program.
Codes and Standards | Oct 30, 2019
ILFI releases new version of Living Building Challenge Framework for Affordable Housing
Document includes updated findings, case studies, new strategies for financing, designing, building affordable housing.
Codes and Standards | Oct 28, 2019
U.S. military demands landlords address health hazards in troop housing
Air Force threatens formal dispute process.