flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

Codes and Standards

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.


By Peter Fabris, Contributing Editor | October 18, 2018

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.

Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.

President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.

Related Stories

| Dec 13, 2012

So-called fiscal cliff is already affecting construction jobs, AGC finds

In November, the construction industry shed 20,000 jobs and its unemployment rate reached 12.2%, according to an analysis by the Associated General Contractors of America.

| Dec 13, 2012

New York City poised to enact recycling mandate for multi-family dwellings

New York City lags behind other large cities in recycling with only 15% of residential trash being recycled. A new bill passed by the City Council aims to improve the rate by changing how new apartment buildings are constructed.

| Dec 13, 2012

Pima County, Ariz. officials say improved code enforcement scores will help lower insurance bills

Insurance Service Office, Inc. (ISO) recently analyzed building codes and enforcement and found that Pima County, Ariz., consistently outscored comparable jurisdictions in Arizona and the nation.

| Dec 13, 2012

D.C. aims to be a green leader with new building codes

The District of Columbia has released a revised set of building codes to make it a leader in green construction.

| Dec 7, 2012

Georgia court limits contractors’ ability to foreclose on liens

The Georgia Court of Appeals ruled in 182 Tenth, LLC v. Manhattan Construction Company that lien claimants such as contractors, subcontractors, and materialmen, may not foreclose on a lien that includes unpaid general condition costs.

| Dec 7, 2012

San Francisco real estate records will include ‘green labels’

Ecologically-sustainable building practices, or “green labels,” will now be included on official land records maintained by San Francisco.

| Dec 7, 2012

Tokyo’s Green Building Program has reduced power consumption by 20%

Tokyo city officials calculate that its Green Building Program reduced energy consumption by 20% since its inception, a statistic they identify as the reason the power stayed on during the 2011 earthquake.

| Dec 7, 2012

New flexible options make achieving LEED certification easier on projects outside the US

A new set of Global Alternative Compliance Paths, or Global ACPs, are now available for all commercial projects pursuing LEED green building certification using the 2009 versions of the rating systems.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021