flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

Codes and Standards

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.


By Peter Fabris, Contributing Editor | October 18, 2018

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.

Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.

President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.

Related Stories

Healthcare Facilities | Jun 10, 2016

Top 10 health technology hazards include some influenced by space design

ECRI Institute’s annual list includes operational and workflow issues.  

Codes and Standards | Jun 9, 2016

Supreme Court ruling could aid developers on properties containing wetlands

Unanimous decision allows landowners to take regulatory decisions straight to court.

Green | Jun 8, 2016

TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

The newly renovated 25,000-sf space achieved gold-level status.

Concrete | Jun 7, 2016

Concrete Institute publishes document providing concrete curing guidance

New curing monitoring techniques included.  

Energy | Jun 7, 2016

Energy modeling payback typically as short as one to two months

Energy modeling is a ‘no-brainer—like checking MPG on a car’

Green | Jun 2, 2016

USGBC offers new LEED pilot credit: Building Material Human Hazard and Exposure Assessment

For assessing human health-related exposure scenarios for construction products.

Resiliency | Jun 1, 2016

Federal agencies boost standards for more resilient construction

HUD, FEMA, GSA, Army Corps of Engineers make policy changes.    

Green | May 31, 2016

Miami Beach requires developers to meet green standards or pay a fee

Applies to structures larger than 7,000 sf.  

Codes and Standards | May 27, 2016

Better enforcement needed for successful implementation of energy efficiency policies

Commercial buildings the focus of recent code initiatives.  

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021