flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

Codes and Standards

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.


By Peter Fabris, Contributing Editor | October 18, 2018

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.

Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.

President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.

Related Stories

Codes and Standards | Oct 26, 2017

Boston’s Old South Church asks tower developer for $19 million for casting shade

Request highlights ongoing conflict between developers and residents over right to sunshine.

Codes and Standards | Oct 24, 2017

Asphalt roofing design guide now available in digital form

Recently updated Modified Bitumen Design Guide can be viewed on smartphones and tablets.

Codes and Standards | Oct 23, 2017

Energy efficiency investments on the rise; will increase next year

Survey of facility management executives shows onsite renewables, energy storage will spike in 2018.

Codes and Standards | Oct 20, 2017

AIA contract document updates include new BIM, digital data provisions

Documents are structurally different from 2007, 2008 versions.

Codes and Standards | Oct 18, 2017

States impacted by hurricanes are improving their energy efficiency policies

Florida, Texas, rise in ACEEE state energy efficiency scorecard.

Codes and Standards | Oct 17, 2017

Updated versions of EnergyPlus and OpenStudio building energy modeling tools released

Open-source apps include enhancements for urban-scale modeling.

Codes and Standards | Oct 16, 2017

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Will allow AIA to make updates more frequently as insurance market changes.

Codes and Standards | Oct 12, 2017

New AIA contract document designates responsibilities for sustainable projects

Roles of architects, contractors outlined in E204–2017.

Codes and Standards | Oct 11, 2017

Data, transparency are keys to next steps in green building, says USGBC chief

Monitoring and comparing performance are critical to advancing sustainability goals.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021