flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

Codes and Standards

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.


By Peter Fabris, Contributing Editor | October 18, 2018

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.

Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.

President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.

Related Stories

Codes and Standards | Mar 29, 2018

Contractors have paid $5.2 million for failing local resident employee mandate on Detroit arena

Companies were only able to meet half of the 51% local worker requirement over course of the project.

Codes and Standards | Mar 28, 2018

Washington State moving to promote mass timber construction with legislation

Bill would require all 12-story or less public buildings to be built with mass timber.

Codes and Standards | Mar 27, 2018

Los Angeles appoints its first chief design officer

Responsibility for enhancing civic architecture and urban design.

Codes and Standards | Mar 26, 2018

National Roofing Contractors Assn., releases updates to its Roof Wind Designer app

Significant changes to online wind-load calculator.

Codes and Standards | Mar 22, 2018

Global construction waste to almost double by 2025

Concerns in Houston, Minnesota over environmental impacts.

Codes and Standards | Mar 21, 2018

Cape Town, South Africa’s dire water supply crisis raises concerns in the U.S.

Los Angeles, Salt Lake City, and Miami among cities at risk for water shortages.

Codes and Standards | Mar 20, 2018

Report shows how LEED certification supports net zero energy

Whole-building energy simulation, ASHRAE compliance requirement are key factors.

Codes and Standards | Mar 15, 2018

Energy efficiency measures contributing to flat demand for power

Utilities having difficulty adjusting to new business environment.

Codes and Standards | Mar 14, 2018

New parking lighting technology is paying off, Energy Dept. says

Newer products can cut energy costs by as much as 70%.

Codes and Standards | Mar 13, 2018

OSHA delays enforcement of beryllium exposure rule

The Occupational Safety and Health Administration (OSHA) voted to delay new beryllium exposure rules until May 11.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021