flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

Codes and Standards

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.


By Peter Fabris, Contributing Editor | October 18, 2018

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.

Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.

President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.

Related Stories

Codes and Standards | Sep 20, 2018

North Carolina law banning use of recent climate science could worsen Hurricane Florence impact

Policies may have undermined ability to make coastal regions more resilient.

Codes and Standards | Sep 19, 2018

AIA endorses building owner participation in cap-and-trade programs

Would spur more energy conservation in buildings and cut carbon emissions.

Codes and Standards | Sep 18, 2018

ConsensusDocs Coalition publishes new Lean Addendum

Industry-first document to facilitate lean tools without need to sign multi-party IPD agreement.

Codes and Standards | Sep 13, 2018

As ICC prepares to vote on codes for tall wood buildings, opposition is still strong

Influential body will vote in October on new provisions to allow 18-story wood-framed structures.

Codes and Standards | Sep 12, 2018

Saltwater incursion into Miami’s aquifer may make city uninhabitable later this century

Rising sea levels likely to claim drinking water before land is under water.

Codes and Standards | Sep 11, 2018

Smart Surfaces Coalition will help cities reduce urban heat island effect

Surfaces can reflect away heat and help prevent flooding.

Codes and Standards | Sep 7, 2018

Certified Green Buildings may have an advantage in capital markets

Research supports financial case for certification.

Codes and Standards | Sep 7, 2018

NIST releases report outlining steps to bolster disaster resiliency

Offers immediate occupancy building codes and performance standards strategies.

Codes and Standards | Sep 6, 2018

Coalition of mayors around the globe pledge net-zero buildings by 2030

New construction to produce as much energy as it consumes.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021