flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

Codes and Standards

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.


By Peter Fabris, Contributing Editor | October 18, 2018

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

One example is the Plaquemines Parish Detention Center, a new $105 million jail, in Louisiana that was destroyed by Hurricane Katrina. Although the building now hovers 19 feet above a marsh perched atop concrete pillars, it must be evacuated before any major storm because it was rebuilt on flood-prone land that could become essentially an island after a flood.

Rather than relocate damaged structures to higher ground, local officials often choose to replicate the past, ignoring new climate realities, theTimes report says. The federal government has actually taken steps back from requirements that could prompt rebuilding projects to beef up resiliency.

President Trump last year rescinded an executive order signed by President Barack Obama that required consideration of climate science in the design of federally funded projects. That could have forced some buildings to be elevated higher. In March, FEMA released a four-year strategic plan that removed previous mentions of climate change and sea-level rise.

Related Stories

Codes and Standards | Jan 9, 2019

Policymakers need to act to alleviate affordable housing crunch

Moody’s economist says costs including mortgage rates worsening situation.

Codes and Standards | Jan 7, 2019

Program uses low-cost sensors to monitor impact of stormwater mitigation systems

University/municipal partnership in Philadelphia aims to improve green infrastructure design.

Codes and Standards | Jan 7, 2019

Washington, D.C., to transition to 100% renewable energy by 2032

Includes measures to reduce emissions from buildings and transportation.

Codes and Standards | Jan 4, 2019

Canada’s National Building Code will include climate change obligations

New durability requirements for new buildings in the works.

Codes and Standards | Jan 4, 2019

LEED v4.1 beta registration begins in January

First releases are O+M, BD+C, and ID+C.

Codes and Standards | Jan 3, 2019

U.S. Appeals Court says general contractors can be cited for subcontractor violations

Ruling will prompt review of OSH decision that said GCs cannot be held liable for subs’ violations.

Codes and Standards | Jan 3, 2019

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.

Codes and Standards | Jan 2, 2019

ASHRAE’s Low-Rise Residential Buildings standard update now available

Performance measures are at least 50% more efficient than 2006 IECC.

Codes and Standards | Jan 2, 2019

Study compares labor hours for various low-slope roofing options

Type of roof covering, project parameters, tool management, and crew efficiency all impact profitability.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021