flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fast-growing UC Merced will double in size by 2020

University Buildings

Fast-growing UC Merced will double in size by 2020

The state’s Board of Regents has approved a $1.34 billion plan that would add nearly 1.2 million sf of new space.


By John Caulfield, Senior Editor | July 22, 2016

UC Merced's campus will greatly expand over the next four years, as the state's Board of Regents has approved a design and construction plan that would allow the 11-year-old university to increase its enrollment by nearly 50%. Image: Courtesy UC Merced

The University of California Board of Regents has unanimously approved an expansion of UC Merced that will nearly double that campus’ physical capacity by 2020 to facilitate enrollment to 10,000 students, up from 6,700 today.

UC Merced opened in the San Joaquin Valley in 2005, making it the first new campus in the University of California system in four decades. In recent years its application growth rate has been double the UC system’s average.

The Regents approval should lead to a formal project agreement next month, with groundbreaking scheduled for October. The university has entered into an “availability-payment concession,” a kind of private-public partnership, with Plenary Properties Merced, which was named development partner in June. Plenary will be responsible for design, construction, operations, maintenance, and partial financing of all new facilities over the 39-year term of the contract.

Upon expiration of the contract, UC Merced will assume maintenance of the buildings and land it will own.

As part of this agreement Plenary increased its investment in design and construction by $204 million. UC financing contribution will be $600 million. The total budget for this project’s design and construction is now $1.338 billion, up from the previously approved $1.142 billion.

The expansion will add about 1.2 million gross sf (790,000 of assignable square footage) of teaching, research, residential, and student-support facilities adjacent to the existing campus. The assignable space is less than the 918,000 sf originally planned, as UC Merced is emphasizing interdisciplinary learning and research, and requires a more flexible and efficient design for its future needs.

Design adjustments also allowed UC Merced to lower its financial commitment by nearly $9 million.

The first buildings should be completed by 2018. Webcor Construction is the general contractor. Skidmore, Owings & Merrill is the lead campus planner. And Johnson Controls is the project’s lead operations and management firm.

This phase of UC Merced’s 2020 Project Master Plan includes state-of-the-art research labs arranged around a new quadrangle and a multifunctional dining facility. The plan also calls for 1,700 beds, as well as classrooms, recreation fields, and a competition pool.

The expansion is projected to create more than 12,000 construction jobs, and produce a one-time statewide economic benefit of $2.4 billion, of which $1.9 billion should benefit the region alone.

Related Stories

University Buildings | May 26, 2016

U. of Chicago approves Diller Scofidio + Renfro design for new campus building

With a two-story base and 165-foot tower, the Rubenstein Forum will have room for informal meetings, lectures, and other university events.

University Buildings | Apr 27, 2016

SmithGroupJJR’s Electrical and Computer Engineering Building named 2016 Lab of the Year

Sustainable features like chilled beams and solar screens help the University of Illinois research facility use 50% less energy than minimum building energy efficiency standards.

University Buildings | Apr 25, 2016

New University of Calgary research center features reconfigurable 'spine'

The heart of the Taylor Institute can be anything from a teaching lab to a 400-seat theater.  

University Buildings | Apr 13, 2016

Technology defines growth at Ringling College of Arts & Design

Named America's “most wired campus" in 2014, Ringling is adding a library, visual arts center, soundstage, and art museum.

University Buildings | Apr 13, 2016

5 ways universities use new buildings to stay competitive

From incubators to innovation centers, schools desire ‘iconic gateways’ that appeal to students, faculty, entrepreneurs, and the community.

University Buildings | Apr 4, 2016

3 key trends in student housing for Boston’s higher education community

The city wants to add 18,500 student residence beds by the year 2030. CannonDesign's Lynne Deninger identifies three strategies that will help schools maximize value over the next decade or so.

University Buildings | Mar 15, 2016

Behnisch Architekten designs Harvard’s proposed Science and Engineering Complex

The 497,000-sf building will be the home of the John A. Paulson School of Engineering and Applied Sciences.

University Buildings | Mar 11, 2016

How architects can help community colleges promote community on campus

Even in the face of funding challenges and historic precedent, there are emerging examples of how partnership between two-year academic institutions and designers can further elevate community on campus. CannonDesign's Carisima Koenig has a few key examples.

University Buildings | Mar 1, 2016

The 5 most questionable college and university rankings of 2015

SmithGroupJJR's David Lantz identifies five of the most flawed higher education rating systems, including ones with arbitrary categories, and others that equate college with a transactional investment.

University Buildings | Feb 29, 2016

4 factors driving the student housing market

In the hyper-competitive higher education sector, colleges and universities view residence halls as extensions of their academic brands, both on and off campus.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021