The Frank Lloyd Wright Foundation today began a formal search for a new Director of the Frank Lloyd Wright School of Architecture. The appointment, which has become available for only the fifth time in the school’s venerable 82-year history, will be the first in a series of efforts by the school aimed at challenging established pedagogical models of architectural education.
“We are remaking the Frank Lloyd Wright School of Architecture, and we are looking for a Director with the energy and vision to help guide the process” said Sean Malone, President and CEO of the Frank Lloyd Wright Foundation. “This is an extraordinary opportunity and we are looking for an extraordinary person to grab it.”
The new Director will be the Chief Academic Officer of the Frank Lloyd Wright Foundation and will be responsible for the School of Architecture’s pedagogical direction, academic programs, personnel, students, finances, and reputation. The Director will also play a strong leadership role in the broader programs of the Foundation and is expected to set the intellectual tone for the School, engaging in contemporary architectural and design discourse at the national and international level.
Victor Sidy, who has led the School of Architecture since 2005, will be stepping down after the next Director is in place to allow him to return to his architectural practice, which engages in projects ranging from residential to educational and cultural facilities.
“We think it’s time to renew our commitment to discovery and invention, and we’re looking for a leader who is ready to speak to a profession in need of direction,” says Reed Kroloff, chair of the Director Search Committee. “We don’t want someone who designs like Wright. We want someone who can think as boldly as he did.”
Letters of interest and resume/qualifications should be sent to Courtney Larsen at clarsen@franklloydwright.org. Review of applications will begin on January 6, 2014 and will continue until the position is filled.
About the Frank Lloyd Wright School of Architecture
Founded by Frank Lloyd Wright in 1932 as an alternative to traditional architectural education, the Frank Lloyd Wright School of Architecture today provides a fully accredited professional Master of Architecture (M.Arch) degree in an intensive, in-residence academic environment. Students explore the discipline through one-on-one interaction with faculty and through work in the design studio, through architectural practice, and on design-build projects. The students’ educational experience is closely linked to its two architecturally stunning campuses, the main Arizona campus (Taliesin West) and the summer Wisconsin campus (Taliesin).
About the Frank Lloyd Wright Foundation
The Frank Lloyd Wright Foundation's vision is to be a leading, global, multi-disciplinary center for education, scholarship, debate and research committed to the place of architecture and arts in enriching the quality and dignity of life. The Foundation is dedicated to the preservation and stewardship of Taliesin in Spring Green, Wisconsin, Taliesin West in Scottsdale, Arizona and the Taliesin Collections, to shaping architecture and design at the highest level and to transforming people’s lives through the living experience of Frank Lloyd Wright’s body of work. www.franklloydwright.org
Related Stories
K-12 Schools | Nov 1, 2022
Safety is the abiding design priority for K-12 schools
With some exceptions, architecture, engineering, and construction firms say renovations and adaptive reuse make up the bulk of their work in the K-12 schools sector.
| Nov 1, 2022
Updated Florida building codes helped newer homes withstand Hurricane Ian
Newer homes seemed to fare much better than older structures during Hurricane Ian, suggesting that updated Florida building codes made a difference.
Wood | Nov 1, 2022
A European manufacturer says its engineered wood products can store carbon for decades
Metsä Wood, a Finland-based manufacturer of engineered wood products, says its sustainable, material-efficient products can store carbon for decades, helping to combat climate change.
Data Centers | Oct 31, 2022
Data center construction facing record-breaking inflation, delays
Data center construction projects face record-breaking inflation amid delays to materials deliveries and competition for skilled labor, according to research from global professional services company Turner & Townsend.
School Construction | Oct 31, 2022
Claremont McKenna College science center will foster integrated disciplinary research
The design of the Robert Day Sciences Center at Claremont McKenna College will support “a powerful, multi-disciplinary, computational approach to the grand socio-scientific challenges and opportunities of our time—gene, brain, and climate,” says Hiram E. Chodosh, college president.
Energy Efficient Roofing | Oct 28, 2022
Rooftop mini turbines can pair with solar panels
A new type of wind turbine can pair well on roofs with solar panels, offering a double source of green energy generation for buildings.
Building Team | Oct 27, 2022
Who are you? Four archetypes shaping workspaces
The new lifestyle of work requires new thinking about the locations where people work, what their workflow looks like, and how they are performing their best work.
Codes and Standards | Oct 27, 2022
Florida’s Surfside-inspired safety law puts pressure on condo associations
A Florida law intended to prevent tragedies like the Surfside condominium collapse will place a huge financial burden on condo associations and strain architecture and engineering resources in the state.
University Buildings | Oct 27, 2022
The Collaboratory Building will expand the University of Florida’s School of Design, Construction, and Planning
Design firm Brooks + Scarpa recently broke ground on a new addition to the University of Florida’s School of Design, Construction, and Planning (DCP).
Building Team | Oct 26, 2022
The U.S. hotel construction pipeline shows positive growth year-over-year at Q3 2022 close
According to the third quarter Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE), the U.S. construction pipeline stands at 5,317 projects/629,489 rooms, up 10% by projects and 6% rooms Year-Over-Year (YOY).