The Frank Lloyd Wright Foundation today began a formal search for a new Director of the Frank Lloyd Wright School of Architecture. The appointment, which has become available for only the fifth time in the school’s venerable 82-year history, will be the first in a series of efforts by the school aimed at challenging established pedagogical models of architectural education.
“We are remaking the Frank Lloyd Wright School of Architecture, and we are looking for a Director with the energy and vision to help guide the process” said Sean Malone, President and CEO of the Frank Lloyd Wright Foundation. “This is an extraordinary opportunity and we are looking for an extraordinary person to grab it.”
The new Director will be the Chief Academic Officer of the Frank Lloyd Wright Foundation and will be responsible for the School of Architecture’s pedagogical direction, academic programs, personnel, students, finances, and reputation. The Director will also play a strong leadership role in the broader programs of the Foundation and is expected to set the intellectual tone for the School, engaging in contemporary architectural and design discourse at the national and international level.
Victor Sidy, who has led the School of Architecture since 2005, will be stepping down after the next Director is in place to allow him to return to his architectural practice, which engages in projects ranging from residential to educational and cultural facilities.
“We think it’s time to renew our commitment to discovery and invention, and we’re looking for a leader who is ready to speak to a profession in need of direction,” says Reed Kroloff, chair of the Director Search Committee. “We don’t want someone who designs like Wright. We want someone who can think as boldly as he did.”
Letters of interest and resume/qualifications should be sent to Courtney Larsen at clarsen@franklloydwright.org. Review of applications will begin on January 6, 2014 and will continue until the position is filled.
About the Frank Lloyd Wright School of Architecture
Founded by Frank Lloyd Wright in 1932 as an alternative to traditional architectural education, the Frank Lloyd Wright School of Architecture today provides a fully accredited professional Master of Architecture (M.Arch) degree in an intensive, in-residence academic environment. Students explore the discipline through one-on-one interaction with faculty and through work in the design studio, through architectural practice, and on design-build projects. The students’ educational experience is closely linked to its two architecturally stunning campuses, the main Arizona campus (Taliesin West) and the summer Wisconsin campus (Taliesin).
About the Frank Lloyd Wright Foundation
The Frank Lloyd Wright Foundation's vision is to be a leading, global, multi-disciplinary center for education, scholarship, debate and research committed to the place of architecture and arts in enriching the quality and dignity of life. The Foundation is dedicated to the preservation and stewardship of Taliesin in Spring Green, Wisconsin, Taliesin West in Scottsdale, Arizona and the Taliesin Collections, to shaping architecture and design at the highest level and to transforming people’s lives through the living experience of Frank Lloyd Wright’s body of work. www.franklloydwright.org
Related Stories
| Feb 27, 2014
Open or private offices? It depends on the business plan
Open layouts are grabbing headlines as a hallmark of the new workplace—think the Google campus or Facebook's headquarters. And for smaller-scale operations, open designs are often lauded for being less expensive than private office plans. But does that mean all offices should have an open layout?
| Feb 27, 2014
3 reasons to apply computational fluid dynamics on your next project
From right-sizing mechanical systems to understanding the impact of design alternatives, CFD offers a host of benefits for the Building Team.
| Feb 27, 2014
12 facts about heat-treated glass: Why stronger isn’t always better
Glass is heat-treated for two reasons: the first is to increase its strength to resist external stresses such as wind and snow loads, or thermal loads caused by the sun’s energy. The second is to temper glass so that it meets safety glazing requirements defined by applicable codes or federal standards.
| Feb 27, 2014
Metal Construction Association introduces two Environmental Product Declarations
Two Environmental Product Declarations (EPD), one for Metal Composite Material Panels and one for Roll Formed Steel Panels for Roofs and Walls, are now available free of charge from the Metal Construction Association (MCA) on its website.
| Feb 27, 2014
Bluebeam Software launches Revu 12 for better field-ready document management and project collaboration
The latest version of the company’s flagship solution better enables users in document-intensive industries to digitally collaborate on project documents and more easily connect the office to the field.
| Feb 27, 2014
PocketCake lunches CPU designed for virtual reality simulations
The company's Virtual Reality Simulation Converter Assembly is three times more powerful than the average high-performance computer and allows for up to eight people to experience a virtual reality simulation at the same time.
| Feb 26, 2014
Adaptive reuse project brings school into historic paper mill
The project features nontraditional classrooms for collaborative learning, an arts and music wing, and a technologically sophisticated global resource center.
| Feb 26, 2014
Use this app to streamline safety inspections
Using the iAuditor app, one of our Skanska teams developed electronic reports that make safety inspections more efficient, and that make it easier to address any issues emerging from them.
| Feb 26, 2014
Startup PocketCake aims to bring virtual reality simulations to the AEC masses
Founded in 2012, the development firm offers custom virtual reality simulations for the price of a typical architectural illustration.
| Feb 26, 2014
Billie Jean King National Tennis Center serving up three-phase expansion
The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium.