flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fan of Frank Lloyd Wright? Here's your chance to run his architecture school

Fan of Frank Lloyd Wright? Here's your chance to run his architecture school

The Frank Lloyd Wright School of Architecture has launched a search for a new director. Deadline for applications is January 6, 2014.


By Frank Lloyd Wright School of Architecture | November 14, 2013

The Frank Lloyd Wright Foundation today began a formal search for a new Director of the Frank Lloyd Wright School of Architecture. The appointment, which has become available for only the fifth time in the school’s venerable 82-year history, will be the first in a series of efforts by the school aimed at challenging established pedagogical models of architectural education.

“We are remaking the Frank Lloyd Wright School of Architecture, and we are looking for a Director with the energy and vision to help guide the process” said Sean Malone, President and CEO of the Frank Lloyd Wright Foundation. “This is an extraordinary opportunity and we are looking for an extraordinary person to grab it.”

The new Director will be the Chief Academic Officer of the Frank Lloyd Wright Foundation and will be responsible for the School of Architecture’s pedagogical direction, academic programs, personnel, students, finances, and reputation. The Director will also play a strong leadership role in the broader programs of the Foundation and is expected to set the intellectual tone for the School, engaging in contemporary architectural and design discourse at the national and international level.

Victor Sidy, who has led the School of Architecture since 2005, will be stepping down after the next Director is in place to allow him to return to his architectural practice, which engages in projects ranging from residential to educational and cultural facilities.

“We think it’s time to renew our commitment to discovery and invention, and we’re looking for a leader who is ready to speak to a profession in need of direction,” says Reed Kroloff, chair of the Director Search Committee. “We don’t want someone who designs like Wright. We want someone who can think as boldly as he did.”

Letters of interest and resume/qualifications should be sent to Courtney Larsen at clarsen@franklloydwright.org. Review of applications will begin on January 6, 2014 and will continue until the position is filled.

About the Frank Lloyd Wright School of Architecture
Founded by Frank Lloyd Wright in 1932 as an alternative to traditional architectural education, the Frank Lloyd Wright School of Architecture today provides a fully accredited professional Master of Architecture (M.Arch) degree in an intensive, in-residence academic environment. Students explore the discipline through one-on-one interaction with faculty and through work in the design studio, through architectural practice, and on design-build projects. The students’ educational experience is closely linked to its two architecturally stunning campuses, the main Arizona campus (Taliesin West) and the summer Wisconsin campus (Taliesin).

About the Frank Lloyd Wright Foundation
The Frank Lloyd Wright Foundation's vision is to be a leading, global, multi-disciplinary center for education, scholarship, debate and research committed to the place of architecture and arts in enriching the quality and dignity of life. The Foundation is dedicated to the preservation and stewardship of Taliesin in Spring Green, Wisconsin, Taliesin West in Scottsdale, Arizona and the Taliesin Collections, to shaping architecture and design at the highest level and to transforming people’s lives through the living experience of Frank Lloyd Wright’s body of work. www.franklloydwright.org

Related Stories

| May 14, 2014

New study shows employees aren't happier working in green buildings

People working in buildings certified under LEED’s green building standard appear no more satisfied with their workplace environments than those in conventional buildings, according to new research from the University of California, Berkeley, and the University of Nottingham.

| May 14, 2014

Construction growth looking up: Gilbane Spring 2014 Economic Report

Construction spending for 2014 should finish 6.6% higher than in 2013, with nonresidential work contributing substantially.

| May 14, 2014

Prefab payback: Mortenson quantifies cost and schedule savings from prefabrication techniques

Value-based cost-benefit analysis of prefab approaches on the firm's 360-bed Exempla Saint Joseph Heritage Project shows significant savings for the Building Team. 

| May 13, 2014

First look: Nadel's $1.5 billion Dalian, China, Sports Center

In addition to five major sports venues, the Dalian Sports Center includes a 30-story, 440-room, 5-star Kempinski full-service hotel and conference center and a 40,500-square-meter athletes’ training facility and office building.

| May 13, 2014

Drexel University case study report: Green Globes cheaper, faster than LEED

GBI’s Green Globes certification process is significantly less expensive to conduct and faster to complete than LEED certification, says Drexel prof.

| May 13, 2014

Steven Holl's sculptural Institute for Contemporary Art set to break ground at VCU

The facility will have two entrances—one facing the city of Richmond, Va., the other toward VCU's campus—to serve as a connection between "town and gown."

| May 13, 2014

Universities embrace creative finance strategies

After Moody’s and other credit ratings agencies tightened their standards a few years ago, universities had to become much more disciplined about their financing mechanisms.

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 13, 2014

Libeskind wins competition to design Canadian National Holocaust Monument

A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.

| May 12, 2014

Defining BIM – What do owners really want?

Given the complexities of the building process, it can be difficult for building owners to effectively communicate what they want and need with BIM. The response to the question usually is, “Give me everything.” 

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021