flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fallingwater Institute’s summer residency programs have a new educational hub

Education Facilities

Fallingwater Institute’s summer residency programs have a new educational hub

Bohlin Cywinski Jackson designed the project.


By David Malone, Associate Editor | February 25, 2019
High meadow studio in the forest

Photo: Christian Phillips

Students of the Fallingwater Institute’s summer residence programs in architecture, art, and design have a new educational hub courtesy Bohlin Cywinski Jackson. Dubbed High Meadow Studio, the building is an addition to and renovation of an existing garage.

The garage was previously used as the summer programs’ design studio, but the small size limited capacity while the lack of natural daylight, views, and ventilation disconnected the space from the nearby meadow. The new studio doubles the existing footprint and adds a fabrication shop, review space, storage, support spaces, a covered outdoor work area, and a strong connection to the natural surroundings.

 

High Meadow Studio exteriorPhoto: Christian Phillips.

See Also: Watch Frank Lloyd Wright and Buckminster Fuller discuss architecture in animated video shorts

 

The existing garage structure was re-skinned and re-purposed to serve as the fabrication shop. Opaque double garage doors were replaced with translucent panels that open to direct views of the meadow. The studio addition is positioned into the forest between mature trees and includes a translucent north wall paired with a full-length pin-up southern wall.

Two red-stained plywood cores house the support and storage spaces and frame the link between the shop and the studio. Roof vents draw air from the forest floor across the studio through operable panels and custom screens block insects from entering the space.

 

High meadow studio outdoor work spacePhoto: Christian Phillips.

 

High meadow studio interior workshop spaceCourtesy BCJ.

 

High meadow studio interior studio space with students at workCourtesy BCJ.

 

The repurposed High Meadow Studio garage workspacePhoto: Christian Phillips.

Related Stories

K-12 Schools | Aug 4, 2016

First Look: New Sandy Hook Elementary School blends safety and nature

The new Sandy Hook Elementary School has been carefully designed with state-of-the-art safety measures to keep students safe.

| Aug 1, 2016

K-12 SCHOOL GIANTS: In a new era of K-12 education, flexibility is crucial to design

Space flexibility is critical to classroom design. Spaces have to be adaptable, even allowing for drastic changes such as a doubling of classroom size.

| Aug 1, 2016

Top 80 K-12 School Construction Firms

Gilbane, Balfour Beatty, and Core Construction head Building Design+Construction’s annual ranking of the nation’s largest K-12 school sector construction and construction management firms, as reported in the 2016 Giants 300 Report.

| Aug 1, 2016

Top 60 K-12 School Engineering Firms

AECOM, Jacobs, and STV top Building Design+Construction’s annual ranking of the nation’s largest K-12 school sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.

| Aug 1, 2016

Top 100 K-12 School Architecture Firms

DLR Group, Stantec, and Huckabee top Building Design+Construction’s annual ranking of the nation’s largest K-12 school sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.

University Buildings | Jul 22, 2016

Fast-growing UC Merced will double in size by 2020

The state’s Board of Regents has approved a $1.34 billion plan that would add nearly 1.2 million sf of new space.

Education Facilities | Jun 1, 2016

Gensler reveals designs for 35-acre AltaSea Campus at the Port of Los Angeles

New and renovated facilities will help researchers, educators, and visitors better understand the ocean.

Education Facilities | Apr 22, 2016

Developers announce updates for Schuylkill Yards, Philadelphia’s new innovation hub

Drexel University's $3.5 billion project will have mixed-use buildings, residential spaces, and educational and research facilities. 

Education Facilities | Mar 28, 2016

Steven Holl wins invited competition to design Rubenstein Commons

The new Rubenstein Commons will be a 20,000-sf structure at the center of the campus for the Institute for Advanced Study in Princeton, N.J.

Market Data | Feb 26, 2016

JLL upbeat about construction through 2016

Its latest report cautions about ongoing cost increases related to finding skilled laborers.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021