Fairfax County, Va., in the Washington, D.C., metro region is considering a major code change to reduce the risk from floods.
The county is reviewing a proposal to base codes on 100-year storms instead of current 10-year storms. County staff cited the elevated risk of flooding in the county due to climate change as justification for the change.
Under the proposal, the county would require all future development to have proper drainage, pipe conveyance, and safety measures to be resilient to a 100-year storm event, adjusting for climate change. A “100-year storm event” is defined by the U.S. Geological Survey as one that statistically has a 1% chance of occurring in any given year. Such a storm would dump about 8 inches of rain over a 24-hour period on the county.
As the effects of climate change increase, that rainfall figure is likely to be adjusted in the future.
Related Stories
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.
| May 23, 2012
Gifford joins Perkins Eastman as principal
Design and planning expertise in science, technology, education, and healthcare.