flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Facebook’s new Frank Gehry-designed Menlo Park HQ extension includes a massive green roof

Office Buildings

Facebook’s new Frank Gehry-designed Menlo Park HQ extension includes a massive green roof

Level 10 Construction was the general contractor for the project.


By David Malone, Associate Editor | September 5, 2018
Aerial view of MPK 21 green roof
Aerial view of MPK 21 green roof

Facebook’s MPK 20 Menlo Park HQ campus is a 433,000-sf building topped with an expansive nine-acre green roof. Completed in 2015, the build team of Facebook, Gehry Partners, and Level 10 Construction didn’t rest for long before beginning MPK 21, a 524,000-sf expansion.

Much like MPK 20, MPK 21 includes a giant level of single-floor, open-plan office space with break-away spaces and service amenities. A single pathway runs the entire length of the building and leads to five unique dining options, 15 art installations, and  a 2,000-seat event and meeting space.

MPK 21’s 3.6-acre green roof (MPK 20 provides an additional 9 acres of green roof space) includes walking trails that weave around hundreds of trees, grasses, and shrubs. Nature doesn't just exist on the roof, however, as 40-foot-tall Redwoods are included in the Town Square, a sheltered green space. MPK 21 connects to MPK 20 via The Bowl, an amphitheater-style courtyard, and also features a bridge that leads over a highway and connects to hiking trails along the neighboring wetlands.

 

See Also: Apple’s new $5 billion headquarters has a glass problem

 

MPK 21 at nightCourtesy Facebook.

 

Among the new building’s sustainability features are a reclaimed water system designed to save 17 million gallons per year and a 1.4-megawatt PV system that creates 2 million kWh of electricity annually. The new building is targeting Leed Platinum certification.

MPK 20 was built in 21 months and, despite being almost 100,000 sf larger, MPK 21 was built in just 17 months. Both buildings include signature Frank Gehry elements such as exterior metal paneling.

 

MPK 21 exterior surrounded by treesThe Town Square. Courtesy Facebook.

 

The BowlThe Bowl. Courtesy Facebook.

 

 

For a more in depth look at MPK 21, click here.

Related Stories

Office Buildings | Jan 22, 2020

Headspace expands Santa Monica corporate HQ

Montalba Architects designed the project.

Office Buildings | Jan 19, 2020

Internet platform connects its employees with mile-long staircase in new HQ

Color also plays a big role in the interior design of this 19-story building.

Office Buildings | Jan 14, 2020

The workplace should be a tool for improving employee engagement

A survey of 1,600 North American workers hints at what workplace elements have the greatest impact.

Office Buildings | Jan 9, 2020

NFL’s Packers and Microsoft add an innovation center to a fledgling business district

The goal is to nurture startups aligned with local industries.

Office Buildings | Jan 9, 2020

Foster + Partners to design Alibaba’s new offices in Shanghai

The firm won a design competition for the project.

Sponsored | HVAC | Jan 6, 2020

Four Ways Building Systems Create Long-term Profitability

When accounting for the total cost of ownership and the potential return on investment, owners and developers should consider total energy usage, the lifespan of building systems equipment, the recruitment and retention of occupants, and lease rates.

Office Buildings | Oct 28, 2019

LEGO opens the first phase of its new Billund, Denmark campus

C.F. Møller Architects designed the project.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021