The Architizer Blog offers a look at master LEGO builder Mike Doyle's latest creation: Contact 1. The city, built out of 200,000 individual LEGO pieces, is the first in a series of works that, as Doyle puts it, celebrates "spirituality, peaceful ET contact, and fantastical worlds."
It took Doyle some 600 hours to design and build Contact 1. In February, he posted the project on Kickstarter in hopes of raising funds for future work. So far he has raised $5,396 from 51 backers. Depending on the amount invested, backers receive either a signed archival print of Doyle's work or one of five DIY building kits, ranging from 220 to 3,000 pieces.
On Kickstarter, Doyle also offers a "tailer" video and a detailed overview of the world he has created.
(http://www.architizer.com/en_us/blog/dyn/81957/lego-artist-builds-city-out-of-200000-individual-lego-pieces/#.UV7TRYJZ9hE)
Related Stories
| Mar 27, 2012
Hollister Construction completes LEED Silver bank in Woodland Park, N.J.
Ground-up construction project included installation of solar panels.
| Mar 26, 2012
Jones Lang LaSalle completes construction of $536M Parkview Regional Medical Center
Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.
| Mar 26, 2012
McCarthy tops off Math and Science Building at San Diego Mesa College
Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.
| Mar 26, 2012
Los Angeles County to host free green building training
Opportunity for residential and commercial building professionals to gain insight on state and county green building standards and regulations.
| Mar 26, 2012
Ball State University completes nation's largest ground-source geothermal system
Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.
| Mar 22, 2012
Hawaiian architecture firm chooses FRP trellis system over traditional materials
MGA Architecture plans to add five more trellis systems on the neighboring building.
| Mar 22, 2012
Moline Public Library uses copper as an exterior building material
Architects incorporate decorative copper panels to create the look of a heavy plate copper shingle.
| Mar 21, 2012
10 common data center surprises
Technologies and best practices provide path for better preparation.
| Mar 21, 2012
ABI remains positive for fourth straight month
Highest spike in inquiries for new projects since 2007.
| Mar 21, 2012
Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design
New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms.