The Architizer Blog offers a look at master LEGO builder Mike Doyle's latest creation: Contact 1. The city, built out of 200,000 individual LEGO pieces, is the first in a series of works that, as Doyle puts it, celebrates "spirituality, peaceful ET contact, and fantastical worlds."
It took Doyle some 600 hours to design and build Contact 1. In February, he posted the project on Kickstarter in hopes of raising funds for future work. So far he has raised $5,396 from 51 backers. Depending on the amount invested, backers receive either a signed archival print of Doyle's work or one of five DIY building kits, ranging from 220 to 3,000 pieces.
On Kickstarter, Doyle also offers a "tailer" video and a detailed overview of the world he has created.
(http://www.architizer.com/en_us/blog/dyn/81957/lego-artist-builds-city-out-of-200000-individual-lego-pieces/#.UV7TRYJZ9hE)
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.