flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Experiential sportsman’s club set to open in Lakewood, Colo.

Sports and Recreational Facilities

Experiential sportsman’s club set to open in Lakewood, Colo.

Nadel Architecture designed the project.


By David Malone, Managing Editor | September 30, 2021
The Gallery Sportsman's Lounge and Range
Courtesy Nadel Architecture

The Gallery Sportsman’s Club & Range will be the Denver area’s first multi-use, experiential indoor shooting facility. The project will feature a high-tech shooting range, retail, and a coffee bar and lounge.

The Nadel Architecture-designed space will include 15 shooting lanes, eight of which will be tactical lanes; private training rooms; and over 3,000 sf of retail. Full-height glass viewing areas will provide visitors a glimpse into the shooting lanes.

The project looks to forgo the feel and aesthetics of a typical gun range. “We’ve branded an environment to disassociate from the stigma of gun ranges – that is dark, dingy, and unwelcoming to new guests,” said Ryan Weller, Director of Retail, Nadel Architecture, in a release. “The space will feature custom art displays created especially for the brand and utilize the latest advancements in range technology. High-end treatments such as polished concrete, solid wood fixturing, natural stone, and ultra-lux decor will provide a refined look and feel that are sure to elevate the user experience.”

The Gallery Sportsman’s Club and Range is slated for completion in the fourth quarter of 2021.

Related Stories

| Jun 20, 2014

Sterling Bay pulled on board for Chicago Old Main Post Office project

Sterling Bay Cos. and Bill Davies' International Property Developers North America partner up for a $500 million restoration of Chicago's Old Main Post Office

| Jun 18, 2014

Six World Cup stadiums have achieved LEED certification

In conjunction with the 2014 FIFA World Cup in Brazil, the U.S. Green Building Council (USGBC) announced that six World Cup stadiums have achieved LEED certification, including South America’s largest stadium, Maracanã in Rio de Janeiro.

| Jun 18, 2014

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

| Jun 16, 2014

6 U.S. cities at the forefront of innovation districts

A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”

| Jun 12, 2014

Austrian university develops 'inflatable' concrete dome method

Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.

| Jun 11, 2014

Esri’s interactive guide to 2014 World Cup Stadiums

California-based Esri, a supplier of GIS software, created a nifty interactive map that gives viewers a satellite perspective of Brazil’s many new stadiums.

| Jun 4, 2014

Construction team named for Atlanta Braves ballpark

A joint venture between Barton Malow, Brasfield & Gorrie, Mortenson Construction, and New South Construction will build the Atlanta Braves ballpark, which is scheduled to open in early 2017. Check out the latest renderings of the plan.

| Jun 2, 2014

Parking structures group launches LEED-type program for parking garages

The Green Parking Council, an affiliate of the International Parking Institute, has launched the Green Garage Certification program, the parking industry equivalent of LEED certification.

| May 29, 2014

7 cost-effective ways to make U.S. infrastructure more resilient

Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.

| May 22, 2014

Just two years after opening, $60 million high school stadium will close for repairs

The 18,000-seat Eagle Stadium in Allen, Texas, opened in 2012 to much fanfare. But cracks recently began to appear throughout the structure, causing to the school district to close the facility. 

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021