EwingCole recently completed a $98,000,000 relocation of the US Military Academy Preparatory School (USMAPS) from Fort Monmouth, N.J. to the grounds of the United States Military Academy (USMA) at West Point.
The 57-acre campus development includes the following:
- 73,000 sf classroom and administrative buildings
- 87,000 sf athletic and fitness space
- 14,000 sf dining and exchange facilities
- 246-bed student quarters
- 3 NCAA athletic fields
Site constraints led to the configuration of the building as a continuous ribbon stretched along the edge of a large, open plane on a steep hillside. This freed virtually the entire plane for athletic fields with little disturbance to the forested hillside, a primary amenity of the site. A gently curving drive leads to the center of the academic block –the heart of the school.
Phase I was completed in the summer of 2011, in time for Reception Day on July 18 when the institution welcomed 244 new cadet candidates, the first class to occupy the new facilities. The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012. The Athletic Building, which is the last phase of the project, will be complete this Spring. BD+C
Related Stories
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Nov 22, 2011
New Green Matters Conference examines emerging issues in concrete and sustainability
High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.
| Nov 22, 2011
Suffolk Construction selected as contractor for Boston luxury residential tower
Project team breaks ground on 488,000-sf building that will feature world-class amenities.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.