flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EwingCole completes first design-build project for the USMA

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.


By By BD+C Staff | March 6, 2012
Site constraints led to the configuration of the building as a continuous ribbon
Site constraints led to the configuration of the building as a continuous ribbon stretched along the edge of a large, open plane

EwingCole recently completed a $98,000,000 relocation of the US Military Academy Preparatory School (USMAPS) from Fort Monmouth, N.J. to the grounds of the United States Military Academy (USMA) at West Point. 

The 57-acre campus development includes the following:

  • 73,000 sf classroom and administrative buildings
  • 87,000 sf athletic and fitness space
  • 14,000 sf dining and exchange facilities
  • 246-bed student quarters
  • 3 NCAA athletic fields

Site constraints led to the configuration of the building as a continuous ribbon stretched along the edge of a large, open plane on a steep hillside. This freed virtually the entire plane for athletic fields with little disturbance to the forested hillside, a primary amenity of the site. A gently curving drive leads to the center of the academic block –the heart of the school.

Phase I was completed in the summer of 2011, in time for Reception Day on July 18 when the institution welcomed 244 new cadet candidates, the first class to occupy the new facilities. The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012. The Athletic Building, which is the last phase of the project, will be complete this Spring. BD+C

Related Stories

| Aug 21, 2014

Strategies for providing great customer service

Customers are inherently inefficient and inconvenient to do business with, writes Customer Service Consultant Micah Solomon, in a recent Forbes post. That’s why he believes great customer service depends on understanding this. SPONSORED CONTENT

Sponsored | | Aug 21, 2014

Defining the measure of success when implementing new technologies

Sasha Reed and Chad Dorgan, McCarthy Building Cos.’s Vice President of Quality and Sustainability, discuss the keys to managing innovation within a large construction firm. SPONSORED CONTENT

| Aug 21, 2014

RTKL's parent company Arcadis acquires Callison

The acquisition of Callison, known predominantly for its leadership in retail and mixed-use design, builds on Arcadis’ strong global design and architecture position, currently provided by RTKL. 

| Aug 21, 2014

Must See: Detroit's Beaux-Arts parking garage

An opulent Renaissance Revival building in downtown Detroit is being used as a parking garage.

| Aug 20, 2014

WELL Building: The next step in green sports construction

The WELL Building Standard, a new protocol that focuses on human wellness within the built environment, is a particularly good fit for sports facilities, write Skanska's Tom Tingle and Beth Heider.

| Aug 20, 2014

Seattle's King Street Station thoughtfully restored [2014 Reconstruction Awards]

After years of neglect and botched renovations, King Street Station sparkles once again.

| Aug 20, 2014

Tour an office with no assigned workstations [slideshow]

The New York office of the Gerson Lehrman Group recently redesigned its office without personal desks or cubicles. The company gave each of its 250 employees a locker, a laptop, and told to work anywhere they wanted, according to Business Insider.

| Aug 20, 2014

Architecture Billings Index reaches highest mark since 2007

The American Institute of Architects reported the July ABI score was 55.8, up noticeably from a mark of 53.5 in June. 

| Aug 19, 2014

Goettsch Partners unveils design for mega mixed-use development in Shenzhen [slideshow]

The overall design concept is of a complex of textured buildings that would differentiate from the surrounding blue-glass buildings of Shenzhen.

| Aug 19, 2014

HOK to acquire 360 Architecture

Expected to be finalized by the end of October, the acquisition of 360 Architecture will provide immediate benefits to both firms’ clients worldwide as HOK re-enters the sports and entertainment market.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021