EwingCole recently completed a $98,000,000 relocation of the US Military Academy Preparatory School (USMAPS) from Fort Monmouth, N.J. to the grounds of the United States Military Academy (USMA) at West Point.
The 57-acre campus development includes the following:
- 73,000 sf classroom and administrative buildings
- 87,000 sf athletic and fitness space
- 14,000 sf dining and exchange facilities
- 246-bed student quarters
- 3 NCAA athletic fields
Site constraints led to the configuration of the building as a continuous ribbon stretched along the edge of a large, open plane on a steep hillside. This freed virtually the entire plane for athletic fields with little disturbance to the forested hillside, a primary amenity of the site. A gently curving drive leads to the center of the academic block –the heart of the school.
Phase I was completed in the summer of 2011, in time for Reception Day on July 18 when the institution welcomed 244 new cadet candidates, the first class to occupy the new facilities. The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012. The Athletic Building, which is the last phase of the project, will be complete this Spring. BD+C
Related Stories
Architects | Apr 19, 2017
Tour Zaha Hadid, Frank Gehry architecture with Google Earth
Google Earth’s new ‘Voyager’ feature allows people to take interactive guided tours.
Multifamily Housing | Apr 18, 2017
Three multifamily, three specialized housing projects among 14 recipients of the AIA’s 2017 Housing Awards
2017 marks the 17th year the AIA has rewarded projects and architects with the Housing Awards.
Projects | Apr 17, 2017
BD+C's 2017 Design Innovation Report
Façades that would make Dr. Seuss smile, living walls, and exterior wall space that doubles as gallery space are all represented in this year's BD+C Design Innovation Report.
Healthcare Facilities | Apr 13, 2017
The rise of human performance facilities
A new medical facility in Chicago focuses on sustaining its customers’ human performance.
Laboratories | Apr 13, 2017
How to design transformative scientific spaces? Put people first
While most labs are designed to achieve that basic functionality, a transformational lab environment prioritizes a science organization’s most valuable assets: its people.
Hotel Facilities | Apr 12, 2017
Hotels embrace place
Today’s hospitality environments emphasize unique, localized experiences to attract and engage guests.
Green | Apr 11, 2017
Passivhaus for high-rises? Research demonstrates viability of the stringent standards for tall residential buildings
A new study conducted by FXFOWLE shows that Building Teams can meet stringent Passivhaus performance standards with minimal impact to first cost and aesthetics.
Curtain Wall | Apr 11, 2017
Masters of geometry
Three firms that specialize in façades that curve, twist, and turn see themselves as artisans of the unthinkable.
Office Buildings | Apr 10, 2017
Innovation lab makes developing eye care solutions a collaborative affair
The Shop East innovation lab presents 13,500 sf of workspace across two floors with an emphasis on collaboration.