flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

evolv1 earns Canada’s first Zero Carbon Building-Design certification

Green

evolv1 earns Canada’s first Zero Carbon Building-Design certification

The multi-tenant commercial office building is currently under construction.


By David Malone, Associate Editor | April 13, 2018

evolv1, a multi-tenant commercial office building under construction in Waterloo, Ont., was awarded Zero Carbon Building – Design certification by the Canada Green Building Council (CaGBC). It is the first building to earn this award.

In order to earn the certification, evolv1 needed to show it has modeled a zero carbon balance for future operations, incorporated a highly efficient envelope and ventilation system to meet a defined threshold for thermal energy demand intensity, and designed onsite renewable energy systems capable of providing a minimum of 5% of building energy consumption.  Over the first 12 months of operation, evolv1 will monitor performance to demonstrate it has achieved a zero emissions balance.

The high-performance building envelope incorporates triple glazing, a solar wall for preheated ventilation, a geo-exchange/VRF HVAC system, a three-story green wall, and a combination of photovoltaics. The building is also targeting LEED Platinum certification and will produce more energy than it consumes.

The Cora Group developed the project, which is slated for completion in summer 2018, Stantec designed and engineered it, and Melloul Blamey is building it.

Related Stories

| Mar 26, 2012

Los Angeles County to host free green building training

Opportunity for residential and commercial building professionals to gain insight on state and county green building standards and regulations.

| Mar 20, 2012

Stanford’s Knight Management Center Awarded LEED Platinum

The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental Science for Managers and Policy Makers, as well as in core classes covering sustainability across the functions of business.

| Mar 20, 2012

New office designs at San Diego’s Sunroad Corporate Center

Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

| Mar 2, 2012

By the Numbers

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021