flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

Mixed-Use

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

The Charlottesville, Va. project is slated for completion later this year.


By David Malone, Associate Editor | April 20, 2021
CODE exterior aerial in Charlottesville

All renderings courtesy EskewDumezRipple

The Center for Developing Entrepreneurs (CODE), located in Charlottesville, Va., will provide 215,000-sf of multi-use space for entrepreneurs, designers, and developers, as well as ground floor retail. The project will act as a connective ligature between the institutional, commercial, and the historic avenues of the city.

CODE will feature an open-air, pedestrian gallery that will promote public circulation from the Mall to Water Street. At the center of the site there will be an exterior courtyard with a sunken water feature and amphitheater for public and private outdoor events. A series of planted rooftop terraces will be visible as the building steps up from the Mall to Water Street. These outdoor terraces will serve as work and gathering spaces for tenants on each floor.

 

CODE coworking commons

 

A variety of retail spaces will be included on the ground floor along with the main lobby entry on the Downtown Mall. A secondary entrance to the lobby will be provided on Water Street. The Water Street side lobby space will be able to double as a coworking studio when not being used as a 200-plus seat auditorium that serves both tenant specific and local community events.

One level of subgrade parking is included and will feature electric vehicle charging stations. Parking spaces have the ability to be converted to alternate uses in anticipation of evolving transportation trends.

 

CODE exterior during the day

 

The design employs systems and technologies that will increase the fresh air exchange and provide fine-tuned environmental controls allowing for natural ventilation and daylighting. Additionally, the building will harvest and reuse rainwater for green roof irrigation.

CODE is targeting LEED Gold certification and is slated for completion later this year.

 

CODE center courtyard space

 

The build team includes:

Design Architect: EskewDumezRipple

Architect of Record: Wolf Ackerman

Contractor: Hourigan Group

Civil Engineer: Timmons Group, Inc. 

Structural Engineer: Fox and Associates, Inc. 

Mechanical Engineer: 2RW Consulting Engineers

Electrical Engineer: 2RW Consulting Engineers

Landscape: Gregg Bleam Landscape Architect

 

CODE library space

 

CODE reception area

Tags

Related Stories

Mixed-Use | Nov 7, 2018

53-story L.A. tower has a series of 12 cantilevered pools

Arquitectonica is designing the building.

Mixed-Use | Nov 5, 2018

44-acre mixed-use project completes in Northridge, Calif.

Ware Malcomb designed the project.

Mixed-Use | Oct 25, 2018

Philadelphia’s uCity Square kicks off major expansion drive

This innovation center has several office, lab, and residential buildings in the works.

Wood | Oct 19, 2018

Design revealed for mass-timber residential tower in Milwaukee

The developer is confident that the city will approve construction, which is scheduled to start next year.

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Mixed-Use | Sep 25, 2018

Dexter Yard to provide Seattle with 540,000 sf of mixed-use space

SkB Architects designed the development.

Mixed-Use | Sep 14, 2018

Six-story structure combines a parking garage with street-level retail

Eskew+Dumez+Ripple designed the structure.

Reconstruction & Renovation | Aug 22, 2018

Former shopping mall becomes mixed-use urban complex in Beijing

Schmidt Hammer Lassen Architects designed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021