flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ESD's founder, Hem Gupta, passes at the age of 85

Engineers

ESD's founder, Hem Gupta, passes at the age of 85

A 53-year career included engineering work on several of Chicago's iconic buildings.


By John Caulfield, Senior Editor | February 16, 2017

Hem Gupta founded Environmental Systems Design, a leading MEP engineering and consulting firm. Image: ESD

Hem Gupta, founder of Environmental Systems Design (also known as ESD), died on February 10 at the age of 85.

The family did not disclose the cause of death.

A native of India, Gupta received his Masters degree in mechanical engineering from the University of Illinois. In 1954, he began his professional career at Skidmore Owings & Merrill. Gupta also worked for Epstein, and was Perkins + Will’s chief engineer when he launched his own firm, ESD, in 1967.

ESD grew into one of Chicago’s largest MEP consulting and engineering firms. The projects it has worked on in that city include the UBS Tower, Citadel Center, and Hyatt Center on Wacker Drive. ESD’s international work includes several buildings for the King Abdullah Financial District in Riyadh, Saudi Arabia.

Gupta is survived by his wife Asha (nee Simpson), four children (Reeta Gupta Brendamore, David, Mark, and Raj, who took over for his father as CEO of ESD in March 2011); 12 grandchildren and one great grandchild.

“My father served as a big brother, father, or grandfather figure for members of our ESD family,” recalls Raj Gupta in a prepared statement.

 

Tags

Related Stories

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| Aug 30, 2013

Local Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 30, 2013

State Government Report [2013 Giants 300 Report]

Stantec, Jacobs, PCL Construction among nation's top state government design and construction firms, according to BD+C's 2013 Giants 300 Report.

| Aug 29, 2013

Is it possible to build a LEED Gold prison?

Why yes, of course it is. Correctional design exerts from Shive-Hattery and the Iowa Department of Corrections will demonstrate how at the upcoming BUILDINGChicago conference and expo, September 9-11 at the Holiday Inn Chicago Mart Plaza.  

| Aug 29, 2013

First look: K-State's Bill Snyder Family Stadium expansion

The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history. 

| Aug 29, 2013

Thornton Tomasetti promotes Khaled Othman to Vice President in the New York office

The Thornton Tomasetti board of directors and managing principals announce the promotion of Khaled Othman, P.E. to vice president in the New York office of the international engineering firm. Mr. Othman has been with Thornton Tomasetti since 1999. 

Sponsored | | Aug 29, 2013

Nichiha USA panels selected for unique mixed-use project in Cambridge, Mass.

Peter Quinn Architects specifies Nichiha’s Illumination Series Panels for a progressive look for a work/live/play development in the heart of the Harvard community.

| Aug 28, 2013

Focusing on the total client experience

Although firms commonly use client satisfaction surveys and interviews to assess how well their teams are performing, a new article from Harvard Business Review suggests these tools might not provide an accurate picture of the total client experience. 

| Aug 28, 2013

Standards for BIM improve reliability of data downstream, but what does this mean for us today?

I’m encouraged to see progress being made to make BIM more useable and reliable downstream. These are all good steps in the right direction, but how can we leverage this additional clarity today? Does it require us to have all stakeholders and team members in the model to collaborate and share information? It appears as if this is the ultimate goal.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021