flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ESD announces senior management changes

ESD announces senior management changes


March 18, 2011

CHICAGO, IL – March 17, 2011 – ESD (Environmental Systems Design, Inc.), an international leader in the design of high performance building systems, announced senior management changes that include Raj Gupta (a member of BD+C's editorial advisory board) becoming the firm’s chief executive officer, replacing Hem Gupta, who remains chairman, and Kurt Karnatz being named president.

Since Hem Gupta founded ESD in 1967, the firm has grown to be one of the largest consulting engineering firms in the U.S.  ESD has been responsible for designing systems for many of Chicago’s iconic buildings and for high profile projects around the world, including UBS Tower, Citadel Center, Hyatt Center and 111 S. Wacker Drive in Chicago; Masdar Headquarters and Emirates Palace Hotel in Abu Dhabi; and several buildings for the King Abdullah Financial District in Riyadh, Kingdom of Saudi Arabia.  Mr. Gupta will continue to play an active role as chairman of the board of directors.

As chief executive officer, Raj Gupta oversees all operations and strategic planning for ESD.  He joined the firm in 1984 as a mechanical engineer and became vice president of the mechanical engineering department in 1990.  In 1993, he was promoted to executive vice president and in 1998 was elected president. Throughout his career Mr. Gupta has led design teams to integrate creative engineering solutions for a wide variety of project types, including governmental, educational, mixed-use, libraries, office buildings, cultural and medical facilities.  He is recognized within the industry for his leadership ability and professional and civic contributions.  He is a member of the executive committee and a trustee of the Chicago Architecture Foundation, a trustee of the Adler Planetarium, a member of the board of directors of the Advocate Charitable Foundation, a member of the Chicago Council on Global Affairs, and a member of the Young President’s Organization.  He is also active as a board member of the Roberts Environmental Center at Claremont McKenna College.

Mr. Gupta is a licensed professional engineer in 33 states and a LEED accredited professional.  He earned a masters of science degree in communications from Northwestern University, a bachelors of science in mechanical engineering from Washington University in St. Louis and a bachelors of arts in management engineering from Claremont McKenna College.

Formerly Executive Vice President, Mr. Karnatz has been a driving force within ESD in the development of sustainable, optimized engineering solutions for high performance buildings.  He has gained international recognition as a leader within the engineering industry for his ability to bridge a commitment for sustainable design with real world constraints of real estate development.  A licensed professional engineer in 21 states, Mr. Karnatz is a registered energy professional in Illinois, a certified energy manager and a LEED accredited professional.  He holds a bachelor of science degree in mechanical engineering from the Illinois Institute of Technology.

ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings.  They deliver value by making healthy and productive environments and by making facilities more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, their engineering and design professionals (200+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs.  Founded in 1967, the firm is a valued partner for many public and private clients seeking to enrich collaboration through diversity.  ESD’s services include: Mechanical, Electrical, Plumbing and Fire Protection Engineering;  LEED Certification Consulting;  Sustainable Design / Energy Modeling;  Commissioning; Technology Systems; and BIM.  For more information, please visit: www.esdglobal.com.

Related Stories

| May 2, 2013

New web community aims to revitalize abandoned buildings

Italian innovators Andrea Sesta and Daniela Galvani hope to create a worldwide database of abandoned facilities, ripe for redevelopment, with their [im]possible living internet community.

| May 1, 2013

A LEGO lover's dream: Guide to building the world's iconic structures with LEGO

A new book from LEGO master builder Warren Elsmore offers instructions for creating scale models of buildings and landmarks with LEGO.

| May 1, 2013

New AISC competition aims to shape the future of steel

Do you have the next great idea for a groundbreaking technology, model shop or building that could potentially revolutionize the future of the steel design and construction industry? Enter AISC's first-ever Future of Steel competition.

| May 1, 2013

Data center construction remains healthy, but oversupply a concern

Facebook, Amazon, Microsoft, and Google are among the major tech companies investing heavily to build state-of-the-art data centers.

| May 1, 2013

Groups urge Congress: Keep energy conservation requirements for government buildings

More than 350 companies urge rejection of special interest efforts to gut key parts of Energy Independence and Security Act

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 30, 2013

Healthcare lighting innovation: Overhead fixture uses UV to kill airborne pathogens

Designed specifically for hospitals, nursing homes, child care centers, and other healthcare facilities where infection control is a concern, the Arcalux Health Risk Management System (HRMS) is an energy-efficient lighting fixture that doubles as a germ-killing machine.

| Apr 30, 2013

First look: North America's tallest wooden building

The Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely availablearound the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.

| Apr 26, 2013

Apple scales back Campus 2 plans to reduce price tag

Apple will delay the construction of a secondary research and development building on its "spaceship" campus in an attempt to drive down the cost of developing its new headquarters.

boombox1
boombox2
native1

More In Category




Codes and Standards

New FEMA rules include climate change impacts

FEMA’s new rules governing rebuilding after disasters will take into account the impacts of climate change on future flood risk. For decades, the agency has followed a 100-year floodplain standard—an area that has a 1% chance of flooding in a given year.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021