flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ESD announces senior management changes

ESD announces senior management changes


March 18, 2011

CHICAGO, IL – March 17, 2011 – ESD (Environmental Systems Design, Inc.), an international leader in the design of high performance building systems, announced senior management changes that include Raj Gupta (a member of BD+C's editorial advisory board) becoming the firm’s chief executive officer, replacing Hem Gupta, who remains chairman, and Kurt Karnatz being named president.

Since Hem Gupta founded ESD in 1967, the firm has grown to be one of the largest consulting engineering firms in the U.S.  ESD has been responsible for designing systems for many of Chicago’s iconic buildings and for high profile projects around the world, including UBS Tower, Citadel Center, Hyatt Center and 111 S. Wacker Drive in Chicago; Masdar Headquarters and Emirates Palace Hotel in Abu Dhabi; and several buildings for the King Abdullah Financial District in Riyadh, Kingdom of Saudi Arabia.  Mr. Gupta will continue to play an active role as chairman of the board of directors.

As chief executive officer, Raj Gupta oversees all operations and strategic planning for ESD.  He joined the firm in 1984 as a mechanical engineer and became vice president of the mechanical engineering department in 1990.  In 1993, he was promoted to executive vice president and in 1998 was elected president. Throughout his career Mr. Gupta has led design teams to integrate creative engineering solutions for a wide variety of project types, including governmental, educational, mixed-use, libraries, office buildings, cultural and medical facilities.  He is recognized within the industry for his leadership ability and professional and civic contributions.  He is a member of the executive committee and a trustee of the Chicago Architecture Foundation, a trustee of the Adler Planetarium, a member of the board of directors of the Advocate Charitable Foundation, a member of the Chicago Council on Global Affairs, and a member of the Young President’s Organization.  He is also active as a board member of the Roberts Environmental Center at Claremont McKenna College.

Mr. Gupta is a licensed professional engineer in 33 states and a LEED accredited professional.  He earned a masters of science degree in communications from Northwestern University, a bachelors of science in mechanical engineering from Washington University in St. Louis and a bachelors of arts in management engineering from Claremont McKenna College.

Formerly Executive Vice President, Mr. Karnatz has been a driving force within ESD in the development of sustainable, optimized engineering solutions for high performance buildings.  He has gained international recognition as a leader within the engineering industry for his ability to bridge a commitment for sustainable design with real world constraints of real estate development.  A licensed professional engineer in 21 states, Mr. Karnatz is a registered energy professional in Illinois, a certified energy manager and a LEED accredited professional.  He holds a bachelor of science degree in mechanical engineering from the Illinois Institute of Technology.

ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings.  They deliver value by making healthy and productive environments and by making facilities more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, their engineering and design professionals (200+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs.  Founded in 1967, the firm is a valued partner for many public and private clients seeking to enrich collaboration through diversity.  ESD’s services include: Mechanical, Electrical, Plumbing and Fire Protection Engineering;  LEED Certification Consulting;  Sustainable Design / Energy Modeling;  Commissioning; Technology Systems; and BIM.  For more information, please visit: www.esdglobal.com.

Related Stories

| Feb 14, 2014

Must see: Developer stacks shipping containers atop grain silos to create student housing tower

Mill Junction will house up to 370 students and is supported by 50-year-old grain silos.

| Feb 14, 2014

The Technology Report 2014: Top tech tools and trends for AEC professionals

In this special five-part report, Building Design+Construction explores how Building Teams throughout the world are utilizing advanced robotics, 3D printers, drones, data-driven design, and breakthroughs in building information modeling to gain efficiencies and create better buildings. 

| Feb 13, 2014

Why you should start with a builder

They say the best way to eat an elephant is one bite at a time. Expanding your building or constructing a new structure for your business, church, or school isn’t all that different. Attacking it is best done in small, deliberate pieces. 

| Feb 13, 2014

Related Companies, LargaVista partner to develop mixed-use tower in SoHo

The site is located at the gateway to the booming SoHo retail market, where Class A office space is scarce yet highly in demand.

| Feb 12, 2014

First Look: Futuristic Silicon Valley campus designed to draw tech startups

The curved campus will consist of four different buildings, one exclusively for amenities like a coffee bar, bike shop, and bank.

| Feb 12, 2014

IIT's College of Architecture launches the Mies Crown Hall Americas Prize

Awarded biennially with a $50,000 prize, the program will recognize the most distinguished architectural works built on the North and South American continents in the preceding two years.

| Feb 11, 2014

Adobe Photoshop update features new 3D printing capabilities

Available as part of an update to Photoshop Creative Cloud, the tool enables users to easily and reliably build, refine, preview, prepare, and print 3D designs.

| Feb 10, 2014

Architecture Design Collaborative announces firm opening in Southern California

Today, Architecture Design Collaborative officially announces the launch of its firm providing a full range of architecture and interior design services nationwide. Architecture Design Collaborative offers architectural design services, comprehensive interior design services, developer collaboration, direct tenant improvement, repositioning and site planning.

| Feb 10, 2014

Ball State to host Geothermal Conference on design, drilling and equipment - April 10, 2014

To best serve the industry, Ball State University has organized a single day conference in which participants will be able to exchange technical notes, develop understandings and share experiences with design, drilling, and equipment issues related to geothermal ground source heat pump technology.

| Feb 7, 2014

DOE, Autodesk team to overhaul the EnergyPlus simulation program

The update will allow a larger ecosystem of developers to contribute updates to the code in order to improve performance and decrease the time required to run energy model simulations.

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021