flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Engineering Innovation Hub completes on SUNY New Paltz campus

University Buildings

Engineering Innovation Hub completes on SUNY New Paltz campus

Urbahn Architects designed the project.


By David Malone, Associate Editor | September 23, 2019
SUNY New Paltz EIH

Photo by Ola Wilk/Wilk Marketing Communications

The State University of New York (SUNY) at New Paltz’s new Engineering Innovation Hub (EIH) has recently completed construction. 

Designed by Urbahn Architects, the two-story EIH was built on a former parking lot on SUNY New Paltz’s main campus. It was designed to allow for a potential expansion to the east if the program requires more space in the future. 

The $13.5million, 19,500-sf building houses the College’s bachelor’s degree program in mechanical engineering, teaching and research lab spaces, 3D print prototyping labs, and the school’s Hudson Valley Additive Manufacturing Center (HVAMC). 

 

EIH lobbyPhoto by Ola Wilk/Wilk Marketing Communications.

 

The HVAMC’s collection of 3D printers are some of the most advanced technology at any academic laboratory in the United States, according to the university. SUNY is the first institution of higher education in the country to be designated a Stratasys-MakerBot Additive Research & Teaching (or SMART) lab by Stratasys, a 3D printing hardware and systems company.

See Also: St. Louis Community College Center for Nursing and Health Sciences opens to students

 

EIH teaching labPhoto by Ola Wilk/Wilk Marketing Communications.

 

The building welcomes students via a 661-sf entrance lobby designed to foster collaboration. It features display cabinets for 3D-printed artifacts, counters with computer charging and data outlets, lounge-style seating, and whiteboards. The building’s first floor also features seating niches within the hallways along the windows that integrate with benches, data access, and charging stations. A 1,900-sf teaching lab includes polished-concrete floors and painted steel columns, beams, and a metal deck ceiling. The HVAMC space is located on the first floor across from the teaching lab. An 850-sf machine shop, mechanical and electrical rooms, and public bathrooms round out the first floor.

 

Photo by Ola Wilk/Wilk Marketing Communications.

 

The second floor is home to a smaller lounge/collaborative space at the end of its main corridor, eight faculty offices, an open office space, a 300-sf conference room, three research/teaching labs, and a 1,200-sf computer lab.

The EIH is centrally located on the SUNY campus and was designed to meet LEED Silver certification requirements.

Also on the Build Team: PC Construction (gc), Vanderweil Engineers (mechanical and electrical engineer), Leslie E. Robertson Associates (structural engineer) BET Engineering Consultants (civil engineer), and Edgewater Design (landscape designer).

 

Photo by Ola Wilk/Wilk Marketing Communications.

 

Mechanical engineering students perform a compressiontestPhoto courtesy of SUNY New Paltz.

Related Stories

University Buildings | Apr 29, 2021

The Weekly Show, April 29, 2021: COVID-19's impact on campus planning, and bird management strategies

This week on The Weekly show, BD+C Senior Editor John Caulfield interviews a duo of industry experts on 1) how campus planning has changed during the pandemic and 2) managing bird infestations on construction sites and completed buildings.

University Buildings | Apr 19, 2021

Duke University’s Wilkinson Building completes

Bohlin Cywinski Jackson designed the project.

University Buildings | Mar 17, 2021

UIC’s Computer Design Center will help meet the demands of a growing student body

LMN Architects in collaboration with Booth Hansen is designing the project.

University Buildings | Feb 26, 2021

Dartmouth College’s new faculty and graduate student center completes

Leers Weinzapfel Associates designed the project.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â