flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Energy research animates science sector [2013 Giants 300 Report]

Energy research animates science sector [2013 Giants 300 Report]

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction.


By Julie Higginbotham, Senior Editor | August 8, 2013
The University of CaliforniaBerkeley Energy Biosciences Building, focused on bi
The University of CaliforniaBerkeley Energy Biosciences Building, focused on biofuels, exemplifies multiple S+T sector trends. The $133 million, 113,200-sf lab is sustainably designed (LEED Gold) and integrates diverse disciplines to attack complex problems of global energy. BP supported the initiative with a $500 million, 10-year grant, and has stationed engineers and scientists to work alongside UCBerkeley researchers. SmithGroupJJR designed the project. PHOTO: BRUCE DAMONTE

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction. “Engineering and chemistry funding are going up now, as is energy research, which seems to continue to get federal funding,” says Andy Vazzano, FAIA, LEED AP, Science and Technology Practice Leader at SmithGroupJJR. “Meanwhile, the sequester and budget cuts are having a negative impact on NIH funding for biomedical research.”

The focus on human health hasn’t totally faded, with many research universities still building new labs—especially those that tie research to clinical practice. “Anything that begins with ‘trans’ or ‘inter’ is still a major trend,” says Ryan Abbott, Science and Technology Project Director at Sundt Construction and a BD+C “40 Under 40” honoree (Class of 2012). “Translational, interdisciplinary. Modern science is a team sport.”

TOP S&T SECTOR ARCHITECTURE FIRMS

 
2012 S+T Revenue ($)
1 HDR Architecture $91,252,000
2 Perkins+Will $48,373,568
3 HOK $38,347,000
4 Stantec $33,111,469
5 SmithGroupJJR $26,400,000
6 Flad Architects $21,480,000
7 Payette $18,434,029
8 ZGF Architects $16,214,267
9 EwingCole $11,000,000
10 FKP Architects $10,250,000

TOP S&T SECTOR ENGINEERING FIRMS

 
2012 S+T Revenue ($)
1 Affiliated Engineers $19,824,000
2 Middough $13,900,000
3 URS Corp. $11,772,124
4 Bard, Rao + Athanas Consulting Engineers $10,500,000
5 RMF Engineering Design $9,200,000
6 Vanderweil Engineers $7,851,900
7 Paulus, Sokolowski and Sartor $7,500,000
8 WSP USA $5,772,095
9 Science Applications International Corp. $3,103,152
10 STV $2,937,000

TOP S&T SECTOR CONSTRUCTION FIRMS

 
2012 S+T Revenue ($)
1 Skanska USA $376,717,474
2 DPR Construction $298,563,642
3 Suffolk Construction $290,560,307
4 Manhattan Construction $199,444,000
5 Whiting-Turner Contracting Co., The $193,160,425
6 JE Dunn Construction $184,799,051
7 Clark Group $174,348,804
8 Turner Corporation, The $157,490,000
9 Structure Tone $143,798,000
10 Consigli Construction $74,568,263

Though the purpose-built med school building is the iconic face of S+T, adaptive reuse is getting a second look for advantages in cost and speed. Many clients are also seeking higher levels of green; LEED Platinum, once thought impossible for labs, is no longer unique, and clients are increasingly eyeing net-zero.

In addition, look for public/private partnerships to assume a greater role, even in the rarefied atmosphere of the Ivy League. Harvard, for instance, has rethought its Allston science campus during a recession hiatus. When the site cranks up again next year, the program will include a 36-acre, privately developed “enterprise research campus” for related companies in pharma, biotech, and venture capital.

Read BD+C's full Giants 300 Report

Related Stories

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

| Sep 26, 2012

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

| Sep 24, 2012

Reed Construction completes Lafarge headquarters in Chicago

Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.

| Sep 24, 2012

Chicago Lakeside shortlisted for the Sustainia Award

The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

| Sep 21, 2012

AAMA and WDMA release updated review and forecast that predicts industry trends

Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.

| Sep 20, 2012

Mid-box retail study shows lack of available sites in Chicago

Existing supply is tight everywhere and almost non-existent in the most attractive zones.

| Sep 20, 2012

Forrester begins construction of freestanding cancer center in Montgomery County, Md.

The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Sep 19, 2012

ABI back into positive territory

South continues to lead regions in demand for design services.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021