flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Energy research animates science sector [2013 Giants 300 Report]

Energy research animates science sector [2013 Giants 300 Report]

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction.


By Julie Higginbotham, Senior Editor | August 8, 2013
The University of CaliforniaBerkeley Energy Biosciences Building, focused on bi
The University of CaliforniaBerkeley Energy Biosciences Building, focused on biofuels, exemplifies multiple S+T sector trends. The $133 million, 113,200-sf lab is sustainably designed (LEED Gold) and integrates diverse disciplines to attack complex problems of global energy. BP supported the initiative with a $500 million, 10-year grant, and has stationed engineers and scientists to work alongside UCBerkeley researchers. SmithGroupJJR designed the project. PHOTO: BRUCE DAMONTE

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction. “Engineering and chemistry funding are going up now, as is energy research, which seems to continue to get federal funding,” says Andy Vazzano, FAIA, LEED AP, Science and Technology Practice Leader at SmithGroupJJR. “Meanwhile, the sequester and budget cuts are having a negative impact on NIH funding for biomedical research.”

The focus on human health hasn’t totally faded, with many research universities still building new labs—especially those that tie research to clinical practice. “Anything that begins with ‘trans’ or ‘inter’ is still a major trend,” says Ryan Abbott, Science and Technology Project Director at Sundt Construction and a BD+C “40 Under 40” honoree (Class of 2012). “Translational, interdisciplinary. Modern science is a team sport.”

TOP S&T SECTOR ARCHITECTURE FIRMS

 
2012 S+T Revenue ($)
1 HDR Architecture $91,252,000
2 Perkins+Will $48,373,568
3 HOK $38,347,000
4 Stantec $33,111,469
5 SmithGroupJJR $26,400,000
6 Flad Architects $21,480,000
7 Payette $18,434,029
8 ZGF Architects $16,214,267
9 EwingCole $11,000,000
10 FKP Architects $10,250,000

TOP S&T SECTOR ENGINEERING FIRMS

 
2012 S+T Revenue ($)
1 Affiliated Engineers $19,824,000
2 Middough $13,900,000
3 URS Corp. $11,772,124
4 Bard, Rao + Athanas Consulting Engineers $10,500,000
5 RMF Engineering Design $9,200,000
6 Vanderweil Engineers $7,851,900
7 Paulus, Sokolowski and Sartor $7,500,000
8 WSP USA $5,772,095
9 Science Applications International Corp. $3,103,152
10 STV $2,937,000

TOP S&T SECTOR CONSTRUCTION FIRMS

 
2012 S+T Revenue ($)
1 Skanska USA $376,717,474
2 DPR Construction $298,563,642
3 Suffolk Construction $290,560,307
4 Manhattan Construction $199,444,000
5 Whiting-Turner Contracting Co., The $193,160,425
6 JE Dunn Construction $184,799,051
7 Clark Group $174,348,804
8 Turner Corporation, The $157,490,000
9 Structure Tone $143,798,000
10 Consigli Construction $74,568,263

Though the purpose-built med school building is the iconic face of S+T, adaptive reuse is getting a second look for advantages in cost and speed. Many clients are also seeking higher levels of green; LEED Platinum, once thought impossible for labs, is no longer unique, and clients are increasingly eyeing net-zero.

In addition, look for public/private partnerships to assume a greater role, even in the rarefied atmosphere of the Ivy League. Harvard, for instance, has rethought its Allston science campus during a recession hiatus. When the site cranks up again next year, the program will include a 36-acre, privately developed “enterprise research campus” for related companies in pharma, biotech, and venture capital.

Read BD+C's full Giants 300 Report

Related Stories

| Jun 13, 2013

AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition

The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York. 

| Jun 12, 2013

More than 90% of New York City schools have code violations

More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.

| Jun 12, 2013

5 building projects that put the 'team' in teamwork

The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team. 

| Jun 12, 2013

Sacred synergy achieves goals for religious education [2013 Building Team Award winner]

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.

| Jun 12, 2013

‘Talking’ Braille maps help the visual impaired

Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.

| Jun 11, 2013

Music/dance building supports sweet harmony [2013 Building Team Award winner]

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021