flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Energy research animates science sector [2013 Giants 300 Report]

Energy research animates science sector [2013 Giants 300 Report]

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction.


By Julie Higginbotham, Senior Editor | August 8, 2013
The University of CaliforniaBerkeley Energy Biosciences Building, focused on bi
The University of CaliforniaBerkeley Energy Biosciences Building, focused on biofuels, exemplifies multiple S+T sector trends. The $133 million, 113,200-sf lab is sustainably designed (LEED Gold) and integrates diverse disciplines to attack complex problems of global energy. BP supported the initiative with a $500 million, 10-year grant, and has stationed engineers and scientists to work alongside UCBerkeley researchers. SmithGroupJJR designed the project. PHOTO: BRUCE DAMONTE

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction. “Engineering and chemistry funding are going up now, as is energy research, which seems to continue to get federal funding,” says Andy Vazzano, FAIA, LEED AP, Science and Technology Practice Leader at SmithGroupJJR. “Meanwhile, the sequester and budget cuts are having a negative impact on NIH funding for biomedical research.”

The focus on human health hasn’t totally faded, with many research universities still building new labs—especially those that tie research to clinical practice. “Anything that begins with ‘trans’ or ‘inter’ is still a major trend,” says Ryan Abbott, Science and Technology Project Director at Sundt Construction and a BD+C “40 Under 40” honoree (Class of 2012). “Translational, interdisciplinary. Modern science is a team sport.”

TOP S&T SECTOR ARCHITECTURE FIRMS

 
2012 S+T Revenue ($)
1 HDR Architecture $91,252,000
2 Perkins+Will $48,373,568
3 HOK $38,347,000
4 Stantec $33,111,469
5 SmithGroupJJR $26,400,000
6 Flad Architects $21,480,000
7 Payette $18,434,029
8 ZGF Architects $16,214,267
9 EwingCole $11,000,000
10 FKP Architects $10,250,000

TOP S&T SECTOR ENGINEERING FIRMS

 
2012 S+T Revenue ($)
1 Affiliated Engineers $19,824,000
2 Middough $13,900,000
3 URS Corp. $11,772,124
4 Bard, Rao + Athanas Consulting Engineers $10,500,000
5 RMF Engineering Design $9,200,000
6 Vanderweil Engineers $7,851,900
7 Paulus, Sokolowski and Sartor $7,500,000
8 WSP USA $5,772,095
9 Science Applications International Corp. $3,103,152
10 STV $2,937,000

TOP S&T SECTOR CONSTRUCTION FIRMS

 
2012 S+T Revenue ($)
1 Skanska USA $376,717,474
2 DPR Construction $298,563,642
3 Suffolk Construction $290,560,307
4 Manhattan Construction $199,444,000
5 Whiting-Turner Contracting Co., The $193,160,425
6 JE Dunn Construction $184,799,051
7 Clark Group $174,348,804
8 Turner Corporation, The $157,490,000
9 Structure Tone $143,798,000
10 Consigli Construction $74,568,263

Though the purpose-built med school building is the iconic face of S+T, adaptive reuse is getting a second look for advantages in cost and speed. Many clients are also seeking higher levels of green; LEED Platinum, once thought impossible for labs, is no longer unique, and clients are increasingly eyeing net-zero.

In addition, look for public/private partnerships to assume a greater role, even in the rarefied atmosphere of the Ivy League. Harvard, for instance, has rethought its Allston science campus during a recession hiatus. When the site cranks up again next year, the program will include a 36-acre, privately developed “enterprise research campus” for related companies in pharma, biotech, and venture capital.

Read BD+C's full Giants 300 Report

Related Stories

| Mar 24, 2014

Frank Lloyd Wright's S.C. Johnson Research Tower to open to the public—32 years after closing

The 14-story tower, one of only two Wright-designed high-rises to be built, has been off limits to the public since its construction in 1950.

Sponsored | | Mar 21, 2014

Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral

Linetec finishes Firestone’s UNA-CLAD panels, achieving a one-of-a-kind, dynamic appearance with the first use of Valspar’s new Kameleon Color

| Mar 21, 2014

Forget wood skyscrapers - Check out these stunning bamboo high-rise concepts [slideshow]

The Singapore Bamboo Skyscraper competition invited design teams to explore the possibilities of using bamboo as the dominant material in a high-rise project for the Singapore skyline. 

| Mar 21, 2014

Pier Carlo Bontempi to receive Richard H. Driehaus Prize from Notre Dame

Established in 2003 by the Notre Dame School of Architecture, the $200,000 Richard H. Driehaus Prize is awarded to a living architect whose work embodies the highest ideals of traditional and classical architecture in contemporary society, and creates a positive cultural, environmental and artistic impact.

| Mar 21, 2014

How to get more referrals

If you’re having a hard time attracting new referrals, here are a few techniques for increasing the number of interactions with potential clients. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 20, 2014

D.C. breaks ground on $2B mega waterfront development [slideshow]

When complete, the Wharf will feature approximately 3 million sf of new residential, office, hotel, retail, cultural, and public uses, including waterfront parks, promenades, piers, and docks.

| Mar 20, 2014

13 dazzling wood building designs [slideshow]

From bold structural glulam designs to striking textured wall and ceiling schemes, these award-winning building projects showcase the design possibilities using wood. 

| Mar 20, 2014

Fluor defines the future 7D deliverable without losing sight of real results today

A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation. 

| Mar 19, 2014

Architecture Billings Index shows slight improvement

 The American Institute of Architects (AIA) reported that the February ABI score was 50.7, up slightly from a mark of 50.4 in January.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021