flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Energy efficiency as a service gaining ground as financing approach for adopting innovations

Codes and Standards

Energy efficiency as a service gaining ground as financing approach for adopting innovations

Building owners can invest in new technology with no upfront cost.


By Peter Fabris, Contributing Editor | December 17, 2020

Courtesy Pixabay

In recent years, innovations in energy efficiency technology has opened many new avenues to reduce electric consumption in buildings.

But it is hard for building owners to keep up with these developments, analyze which options are most cost effective, and decide how best to invest their money. An increasingly popular method to implement energy efficiency technology is called “energy efficiency as a service.”

A typical arrangement consists of a building owner and a provider striking an agreement that pays for energy efficiency projects. The building owner does not pay anything upfront. The owner makes payments in installments within a certain timeframe. Payments are in the form of savings in energy costs realized from the improvements.

Bentley Mills, a manufacturer of commercial carpet products, employed this technique to fund a $1.5 million energy efficiency project. The contract stated that over the course of the 8-year term, Bentley would save over 12.8 million kWh. One year after the project was completed, the plant measured a 21% decrease in the kWh per square yard manufactured while increasing sales growth by 9% during the same time.

Related Stories

Codes and Standards | Mar 27, 2018

Los Angeles appoints its first chief design officer

Responsibility for enhancing civic architecture and urban design.

Codes and Standards | Mar 26, 2018

National Roofing Contractors Assn., releases updates to its Roof Wind Designer app

Significant changes to online wind-load calculator.

Codes and Standards | Mar 22, 2018

Global construction waste to almost double by 2025

Concerns in Houston, Minnesota over environmental impacts.

Codes and Standards | Mar 21, 2018

Cape Town, South Africa’s dire water supply crisis raises concerns in the U.S.

Los Angeles, Salt Lake City, and Miami among cities at risk for water shortages.

Codes and Standards | Mar 20, 2018

Report shows how LEED certification supports net zero energy

Whole-building energy simulation, ASHRAE compliance requirement are key factors.

Codes and Standards | Mar 15, 2018

Energy efficiency measures contributing to flat demand for power

Utilities having difficulty adjusting to new business environment.

Codes and Standards | Mar 14, 2018

New parking lighting technology is paying off, Energy Dept. says

Newer products can cut energy costs by as much as 70%.

Codes and Standards | Mar 13, 2018

OSHA delays enforcement of beryllium exposure rule

The Occupational Safety and Health Administration (OSHA) voted to delay new beryllium exposure rules until May 11.

Codes and Standards | Mar 12, 2018

L.A. mayor proposes mandatory seismic retrofits for steel buildings, daycare centers, private schools

Los Angeles Mayor Eric Garcetti has proposed a seismic retrofit requirement for vulnerable steel buildings built before the 1994 Northridge earthquake.

Codes and Standards | Mar 8, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

boombox1
boombox2
native1

More In Category



Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021